I. Company Overview
Yunnan Mile Leidatan Hydropower Co., Ltd. was established in June 2002 as a joint venture with 55% investment from Chengxing Co., Ltd. and 45% investment from Yunnan Yuanyuan Innovation Industrial Co., Ltd. The Leidatan Hydropower Station is equipped with three hydroelectric generating units with a total installed capacity of 108,000 kilowatts, primarily supplying electricity to support yellow phosphorus production at Yunnan Mile Phosphorus-Electric Chemical Co., Ltd. The Leidatan Hydropower Station is one of Yunnan Province's Double Hundred Key Projects.
II. Position Available
Comprehensive Materials Administrator (1 person)
1. Job Requirements: This position is primarily responsible for material inspection and warehousing, inbound and outbound operations, and "Five Doubles" safety management; establishing ERP ledgers and coordinating with the finance department on material accounting, inventory reconciliation, and report preparation; during maintenance periods, assisting with on-site material distribution and supporting the maintenance team. Candidates must have a college degree or above (preferably in logistics, warehousing, accounting, computer science, electrical engineering, mechanical engineering, or related fields) and possess warehouse management experience (those with experience in hydropower stations, industrial operations, or materials accounting and statistics are preferred). Proficiency in Office and ERP systems is required, along with basic financial knowledge (forklift or crane operator certificates are preferred). This is a versatile position requiring a meticulous work ethic, strong adherence to principles, the ability to endure hardship and adapt to the on-site environment of a hydropower plant, and good communication and compliance awareness.
2. Work Location: Pulong Village, Dongshan Town, Mile City, Honghe Prefecture
3. Salary and Benefits: 4,000–5,000 RMB per month; benefits include five insurances and one housing fund, year-end bonus, holiday allowances, paid annual leave, and meals and accommodation provided.
III. How to Apply
(1) Application Deadline: Before November 30, 2026
(2) Application Method: Send materials to email 451604207@qq.com
(3) Interview Location: No. 2, Row 1, Zone A, Huquan Residential Area, Mile City
IV. Contact Information
Contact Person: Teng Ting
Phone: 13529677082 (same number on WeChat)
Yunnan Mile Leidatan Hydropower Co., Ltd.
November 11, 2026
Comments