Metallurgical Corporation of China Ltd. (MCC) reported that newly signed contracts reached RMB248.03 billion between January and April 2026, with overseas contracts contributing RMB14.17 billion during the same period.
In April alone, MCC secured three engineering and construction contracts—each exceeding RMB1 billion—for a combined value of RMB8.04 billion:
• RMB4.70 billion EPC contract for mining exploitation and processing services at the Fulin Construction Sandstone Mine in Wuzhou, awarded to Zhongye Changtian International Engineering.
• RMB2.05 billion design-and-build contract for the urban village renovation (Plot 02, Lezhu Area) in Guangzhou’s Huangpu District, undertaken by China MCC 22 Group.
• RMB1.29 billion general contracting mandate for commercial, residential and supporting works at the Longhu High School Affiliated Station TOD plot on the East Guangdong Intercity Railway, awarded to China MCC 5 Group.
The company notes that these figures are preliminary and subject to confirmation in forthcoming periodic reports.
Comments