Maximum Control Price of 2.8845 CNY/Wp! Guangdong School Launches EPC Tender for Distributed PV Project

Deep News11-25

Recently, the tender announcement for the EPC general contracting of the distributed photovoltaic power generation project at Qingyuan Qingshi School was released. The tender is issued by Qingyuan Chengchuang Energy Development Co., Ltd., with the project site located at No. 1 Xuexian Road, University Town, Qingcheng District, Qingyuan City, Guangdong Province.

**Project Overview**: The EPC general contracting for the distributed PV project at Qingyuan Qingshi School has a total installed capacity of 3,520.625 kWp. The scope of work includes all design, construction, defect rectification during the warranty period, and maintenance.

**Key Tender Details**: - Assist the owner in obtaining necessary approvals from local government authorities and the power supply bureau, including supporting documents from departments such as forestry, natural resources, agriculture, and water resources. - Handle grid-connection approvals and related documentation. - Conduct preliminary design (including budget preparation), construction drawing design, and subsequent construction until project completion, handover, and final acceptance. - Support the owner in project registration, approvals, settlement, and audit processes. - Address defect repairs and warranty obligations during the project's warranty period.

The estimated budget for the project is **10,155,242.81 CNY**, with a maximum fixed comprehensive unit price control of **2.8845 CNY/Wp** (including survey and design fees at 0.0479 CNY/Wp and construction fees at 2.8366 CNY/Wp, with safety and civilized construction costs calculated separately at 0.0342 CNY/Wp, excluded from bid discounts).

**Cost Coverage**: The quoted unit price includes survey and design fees, installation, equipment, materials, quality inspection, insurance, and other expenses (such as building safety assessments, structural reinforcement, roof repairs, and system integration, with the exception of on-site surveys and design-related costs, which are the contractor's responsibility).

**Project Timeline**: The construction period is **90 days** (subject to the signed contract).

For further details, refer to the tender announcement.

Disclaimer: Investing carries risk. This is not financial advice. The above content should not be regarded as an offer, recommendation, or solicitation on acquiring or disposing of any financial products, any associated discussions, comments, or posts by author or other users should not be considered as such either. It is solely for general information purpose only, which does not consider your own investment objectives, financial situations or needs. TTM assumes no responsibility or warranty for the accuracy and completeness of the information, investors should do their own research and may seek professional advice before investing.

Comments

We need your insight to fill this gap
Leave a comment