The Luannan County government in Tangshan, Hebei Province, has issued a notice regarding the situation where the Huogezhuang Township sewage treatment plant was never put into operation after its completion. A joint investigation team at both the municipal and county levels has been established to conduct a comprehensive review. Previously, People's Daily reported through its letters investigation column that a sewage treatment plant built with over 8 million yuan in government investment had remained unused for four years.
According to a letter from a reader, the Luannan County government invested over 8 million yuan to build the Huogezhuang Township sewage treatment plant, which has never been activated since completion. Today, crops such as cabbage and corn are being grown in the plant's courtyard, and the pipeline road surface has experienced subsidence and other problems. A netizen on People's Online "Leadership Message Board" provided a tip based on the clues. On November 10, a People's Daily reporter traveled to Luannan County in Tangshan, Hebei Province, to conduct an investigation.
Drainage canal filled with sewage and garbage, treatment plant gates tightly shut with overgrown weeds
When the reporter arrived at Huogezhuang Township, the first thing visible was the black and foul-smelling water body beside the main township road — the Huogezhuang No. 2 Drainage Canal (referred to as "No. 2 Drain"). This central canal running through the Huogezhuang Township area serves flood control and drainage for multiple villages, combining flood discharge and ecological functions. The reporter observed that the "No. 2 Drain" was overgrown with weeds, piled with household garbage, the water appeared pitch-black, with white foam floating on the surface and a pungent odor. The black and foul water body extends southward along the county road Guliu Line for more than 3 kilometers, with townships and farmland distributed on both sides, home to dozens of shops and hundreds of farming households.
Walking south along the "No. 2 Drain" riverbank, the reporter saw four or five drainage outlets on the east side of the canal discharging sewage, with flies and insects swarming around, and food scraps, plastic foam, plastic bags, wine bottles and other garbage accumulating near the discharge outlets. The reporter randomly interviewed several villagers and shopkeepers, all of whom expressed strong complaints about the filth and stench of this canal. "When we were children, we used to catch fish and shrimp in the water, and the water quality was good. Later, factories and schools were built, and the canal gradually became polluted. It has gotten worse and worse over the years," said an older villager. "Sewage flows all year round, and in summer the stench is unbearable — you can't even open the windows. Now that winter has arrived and it snowed a few days ago, the smell is a bit less today," said a shopkeeper. "Someone accidentally fell into the water, and the sludge stuck to their body — they washed for a long time and stains remained. This kind of sludge is extremely stubborn."
About a hundred meters east of the canal, the reporter found the Huogezhuang Township sewage treatment plant mentioned by the netizen. The plant occupies a small area, and part of the fence on the west side has collapsed. The iron gate has no sign, simply tied with a black rope, and is unattended. Entering the plant area, weeds are overgrown in the courtyard, with cabbage, corn and other crops planted in some areas, and agricultural plastic film covering others. A equipment room door is locked, with no signs of any machinery operating. A public notice board hangs outside the equipment room, reading: "As a provincial-level characteristic town, Huogezhuang Township must complete the construction of township-level sewage treatment facilities in accordance with the requirements of the higher-level housing and construction department. In September 2018, approved by the county government, Luannan County Urban Construction Development Co., Ltd. (a subordinate enterprise of the County Housing and Construction Bureau) undertook the construction of this project. The estimated total investment is 8.18 million yuan..."
"The sewage treatment facilities mainly collect production and domestic sewage from the Huogezhuang spinning park, middle school, high school, health center and street shops, benefiting over 3,000 people, with a daily sewage treatment capacity of 500 cubic meters. The sewage pipeline network was laid along Huogezhuang Township Government Avenue, Weili Street, Weiming Street, Nanxin Road, existing roads, planned branch roads, and Weifeng Street, with a total length of 3,062 meters; the sewage treatment plant site is located at the southern end of the Huogezhuang farmers' market, covering about 2.3 mu..." Weeds are overgrown in the courtyard of the sewage treatment plant.
"When construction started, we were very excited and happy," said a nearby shopkeeper. But after completion, it was never used. The sewage from shops and villages was never connected to this main pipeline network, sewage continued to be discharged randomly, and the stench and mosquitoes never diminished. On a villager's phone, the reporter saw that just a few days earlier, a villager had posted a video in the village collective WeChat group complaining that the canal in front of their door smelled of "pig manure." Others said that because the sewage treatment plant was built, a school was introduced to the area. The sewage treatment plant has never been used, yet the school discharges a large volume of sewage, making the "No. 2 Drain" even dirtier.
Guided by villagers, the reporter found a drainage pipe outlet more than half a meter in diameter on the east side of the canal, discharging dark green sewage. A villager said: "This is the school's sewage outlet. The school has over 2,000 teachers and students, and all domestic sewage is discharged here after simple treatment." In subsequent interviews, local authorities stated that the school has its own sewage treatment facilities that meet discharge standards. Villagers and shopkeepers said they had repeatedly asked relevant departments when the sewage treatment plant would be activated, but received no results. "This sewage treatment plant is just a 'vanity project' and 'image project,'" said one villager.
Sewage-flooded "No. 2 Drain" has sand leakage and severe blockage problems; pipeline network cannot collect or discharge sewage
Why was the sewage treatment plant built but never used? A villager provided the reporter with a document signed and stamped by the "Luannan County Housing and Urban-Rural Development Bureau" and the "Luannan County Huogezhuang Township People's Government," dated "September 18, 2025." The document states: "The project was completed in October 2022. During the commissioning process, it was discovered that the pipeline network and inspection wells from the Huogezhuang Yinlong Commercial Building to the Changliang Spinning Factory section had sand leakage and severe blockage problems, preventing the sewage pipeline network from collecting and discharging sewage. Therefore, the sewage treatment plant was not organized for acceptance inspection and has not been put into use. Currently, judicial procedures have been initiated to legally clarify the responsibilities of the survey, design, construction, and supervision units involved. The county People's Court has accepted the case."
In response, Jia Jingshu, Director of the Luannan County Housing and Construction Bureau, confirmed that the Huogezhuang Township sewage treatment plant involves two parts — plant construction and pipeline network construction — with 8 million yuan in special bond funds sought and a total investment of 8.87 million yuan. However, due to pipeline issues, it has never been put into use. Not only have the sewage treatment plant and underground pipelines had problems, but the pipeline road surface has also collapsed multiple times in recent years. Walking along the road, the reporter could clearly see uneven road surfaces, traces of repairs after collapses, some sewage well covers cracked or missing, and some sewage wells filled with sand. "After rain, water often accumulates, and we don't dare ride electric bikes, let alone walk through," said a shopkeeper.
On one hand, the sewage treatment plant was built but never used; on the other, sewage is being directly discharged into the canal. What do local relevant departments think? "There are over 80 shops and more than 1,500 villagers along the 'No. 2 Drain,' with the township government, schools, health centers, and enterprises distributed along it. It should be said that most of the water discharged into the 'No. 2 Drain' has undergone simple treatment. But we admit that it still qualifies as sewage," said Li Zhinan, Party Secretary of Huogezhuang Township. "We also cannot rule out that some shopkeepers have connected sewage pipes to rainwater pipes, allowing untreated sewage to be directly discharged into the canal. Additionally, the Huogezhuang Township market is located along the canal, and during market days there is littering, which worsens the pollution."
Garbage in the Huogezhuang "No. 2 Drain." The construction, design, and survey units are shifting responsibility among themselves over project quality issues; legal procedures have been initiated.
With over 8 million yuan invested in a sewage treatment plant, how could the project quality be so poor, and who is responsible? Local officials said the construction unit believes it built according to design standards and the project itself has no problems — it was a design issue. The design unit, however, believes it was a preliminary survey problem, as the survey was conducted based on the load-bearing capacity of an ordinary rural road, without considering heavy vehicles passing through. "The construction party does not admit there is a problem, so we brought in a third-party company for appraisal. The expert panel identified the main causes of sand leakage as vehicle rolling, concrete sealing ring detachment, and water level differences, and recommended we take legal action against the four units involved in survey, design, construction, and supervision," Jia Jingshu explained.
During the construction process, did the Housing and Construction Bureau bear supervisory responsibility? Jia Jingshu stated that the Housing and Construction Bureau is the administrative department in charge of the Huogezhuang Township sewage treatment plant construction, and Luannan County Urban Construction Development Company is the contracting unit. The Housing and Construction Bureau should have exercised some supervision, but "during the construction process, the local area was Huogezhuang, and on-site management was the responsibility of Huogezhuang Township, and no problems were found." Some members of the public reported that the full project payment was disbursed before the sewage treatment plant passed acceptance inspection, leading to a situation where no one took responsibility when problems arose. The Housing and Construction Bureau denied this. "The project payment was disbursed according to the contract and construction progress. Currently, over 7.3 million yuan has been disbursed. About 170,000 yuan remains undisbursed for the pipeline network project as a quality guarantee deposit. About 1.38 million yuan remains undisbursed for equipment installation and infrastructure construction in the plant area," Jia Jingshu said.
Regarding public claims that the sewage treatment plant is a "vanity project" or "image project," the Housing and Construction Bureau disagrees. "From the planning and implementation to the subsequent construction, this project was never a 'vanity project,'" Jia Jingshu said. Exterior view of the sewage treatment plant.
He explained that the county Housing and Construction Bureau had wanted to have the government advance funds to restore the pipeline network and road surface and put the sewage treatment plant into operation while judicial procedures were underway. "In 2024, the Housing and Construction Bureau asked relevant enterprises to survey and design the pipeline network, formulate a restoration plan and complete a review, estimating a need for 2.31 million yuan. But the legal advisor believed that if restoration were done first, it would damage the site and make it impossible to determine the responsibilities of the four units, so the plan was not implemented." Currently, local authorities have filed a lawsuit with the court requesting determination of responsibility and recovery of losses. The court accepted the case in 2025 and is conducting testing and appraisal of the project.
Regarding the worsening pollution in the "No. 2 Drain" caused by the sewage treatment plant not being activated, Li Zhinan stated that daily cleanup efforts would be increased, including mobilizing local enterprises and residents to participate in cleanup. A villager told the reporter, "This spring, the government organized excavators for half a month to clean up a large amount of garbage and sludge." But he believed this was only a temporary fix. "'No. 2 Drain' pollution definitely affects residents' quality of life," Jia Jingshu said. "We consulted the environmental protection department. Before the sewage treatment plant is put into use, the only fundamental solution is interception — transporting sewage and sludge to the treatment plant — but the cost is too high. Only when the sewage treatment plant is activated can this section of sewage be fundamentally resolved."
In response, the head of the Luannan County Party Committee stated, "The county must bear responsibility for the pipeline network connection and subsequent operation of the Huogezhuang Township sewage treatment plant. The county People's Court will accelerate the trial progress in accordance with the law. The county Water Resources Bureau has proposed a multi-million-yuan dredging project for the 'No. 2 Drain' and is applying for funding. At the same time, through interception and treatment, sludge will be cleaned up by means of water dilution and chemical treatment." As of press time, local authorities have begun cleaning up garbage in the "No. 2 Drain" canal. Regarding the activation of the Huogezhuang Township sewage treatment plant, we will continue to follow up.
Comments