Hefei's industry and information technology authority has issued a comprehensive set of policy interpretations covering the tiered cultivation of quality small and medium-sized enterprises, major technical equipment assessment, green factory management, enterprise technology centers, municipal industrial design centers, and telecommunications base stations.
Guidance on Tiered Cultivation of Quality SMEs
Technology and innovative SMEs include technology-based SMEs and innovative SMEs within their validity period. The evaluation criteria and procedures for innovative SMEs are set out as follows.
Regarding the recognition standards for innovative SMEs, the Interim Measures for the Tiered Cultivation and Management of Quality SMEs (MIIT Enterprise [2022] No. 63) specify that applicants must meet the following conditions: registered in China with independent legal personality and compliant with the SME Classification Standards; not listed in the business abnormality directory or the list of seriously dishonest entities, with products or services not falling into prohibited, restricted, or eliminated categories; no major safety incidents, quality issues, environmental pollution accidents, or tax evasion in the past three years; and an evaluation score of at least 60 points, including at least 20 points for innovation capability and at least 15 points each for growth and specialization indicators, or meeting one of the following alternative conditions: receiving national or provincial science and technology awards in the past three years; holding valid honors such as high-tech enterprise, national technological innovation demonstration enterprise, intellectual property advantage enterprise, or intellectual property demonstration enterprise; possessing a recognized research and development institution at or above the provincial or ministerial level; or obtaining new equity financing of at least 5 million yuan from qualified institutional investors in the past three years.
On the application procedures, enterprises should register on the Quality SME Tiered Cultivation Platform (https://zjtx.miit.gov.cn) according to territorial principles, file applications independently and truthfully with required forms and supporting materials. County and municipal SME authorities will review the self-assessment information and conduct on-site spot checks. Provincial SME authorities will then review, conduct on-site inspections and public announcements. Those passing the public notice period without objection will be officially announced as innovative SMEs.
Applications are generally organized in the first and fourth quarters of each year. The designation of innovative SME is valid for three years, after which enterprises must re-log into the cultivation platform for self-assessment, and upon approval by provincial authorities including on-site spot checks, the validity is extended by three years.
Regarding specialized, refined, distinctive and innovative SMEs, the Measures for the Tiered Cultivation and Management of Quality SMEs (MIIT Enterprise [2026] No. 2) specify that applicants must: be lawfully established in China and compliant with SME Classification Standards; not be in the business abnormality directory or seriously dishonest entity list; have no major production safety accidents, major network and data security incidents, major environmental violations, serious quality problems, or serious violations of industry management regulations in the past three years; have already obtained the technology and innovative SME designation and operated in a specific niche market for at least three years as of the end of the previous year; have annual operating revenue of at least 15 million yuan or new equity investment of at least 20 million yuan from qualified institutional investors in the past two years, with main business revenue accounting for at least 80% of total revenue and year-end debt-to-asset ratio not exceeding 80%; have R&D expenses of at least 1 million yuan in each of the past two years, with R&D intensity of at least 3% annually; possess at least one Class I intellectual property related to the main product that has been practically applied and generated economic benefits, though companies that have won provincial or higher science and technology awards in the past three years or possess recognized provincial or higher R&D institutions are exempt from this requirement; have a leading market share in domestic or international niche markets with considerable recognition and influence; and achieve a score of at least 50 points in the SME specialized development evaluation.
The application process follows the same platform-based approach, with county and municipal authorities conducting reviews and on-site verification, followed by provincial-level review, verification, and public announcement. Anhui Province generally conducts specialized SME recognition in the third quarter of each year. The designation is valid for three years and subject to review by provincial authorities before each expiry, with a three-year extension upon passing.
For specialized and innovative "little giant" enterprises, the same measures require: lawful establishment and compliance with SME classification standards; no listing in abnormality or dishonesty directories; no major safety, security, environmental, or quality violations in the past three years; existing specialized SME designation with at least three years in a specific niche market; annual operating revenue of at least 50 million yuan with main business revenue accounting for at least 90% of total revenue, compound annual revenue growth of at least 5% over the past two years (not required for review enterprises), and year-end debt-to-asset ratio not exceeding 75%; combined R&D expenses of at least 12 million yuan over the past two years with annual R&D intensity of at least 3%; at least four Class I intellectual property items related to the main product, though national science and technology award winners in the past three years are exempt; main product market share of at least 10% domestically or internationally or among the top three domestically, with high recognition and influence; main products belonging to core basic components, key software, advanced basic processes, key basic materials, or industrial technology foundations, or contributing to traditional industry upgrading, emerging industry cultivation, or future industry layout in critical links of the industrial chain; and achieving at least 60 points in the SME specialized development evaluation.
The application process involves platform registration, county and municipal review and on-site verification, provincial review and public announcement, followed by recommendation to the Ministry of Industry and Information Technology for final review, spot checks, and recognition. Little giant recognition is generally organized in the second quarter of each year. The designation is valid for three years, subject to review by the Ministry of Industry and Information Technology before each expiry, with a three-year extension upon passing.
Policy Interpretation on Major Technical Equipment, New Materials, and Software Assessment
The Interim Measures for the Assessment and Promotion Management of Hefei's First Set of Major Technical Equipment, First Batch of New Materials, and First Edition of Software provide policy guidance through illustrated interpretation.
Guidance on Green Factory Cultivation and Management
Hefei municipal-level green factories are production-oriented factories evaluated and recognized by the municipal industry and information technology bureau and included in the city's green manufacturing system list. They are built around five dimensions: low-carbon energy, efficient resource use, clean production, green products, and intensive land use. This represents a municipal-level honor for enterprise green development and serves as a foundational step for applying for provincial and national green factories.
To qualify, applicants must meet the following basic conditions: registered and actually producing within Hefei's administrative area with independent legal personality or independently accounted units treated as legal persons, engaged in actual manufacturing; clearly defined management responsibilities for green manufacturing with medium and long-term plans and annual quantitative targets for green and low-carbon development; implementation and continuous improvement of quality, environmental, energy, and occupational health and safety management systems in accordance with GB/T19001, GB/T24001, GB/T23331, GB/T45001 or other applicable industry standards; and compliance with the latest green factory standards and policy requirements.
Enterprises with the following conditions in the past three years cannot apply: not normally operating (business deregistration, continuous shutdown for over 12 months, or listed in the business abnormality directory without removal); major or above safety including network and data security, quality, or environmental pollution accidents, or tax evasion and other illegal activities; those dynamically removed from the municipal green factory list; those found with serious problems in inspections by the State Council, relevant ministries, or provincial or municipal governments and departments; those listed for industrial energy conservation supervision rectification without completing required corrections; and those listed as dishonest persons subject to enforcement.
The creation process runs annually. The municipal bureau of industry and information technology issues application notices. Enterprises voluntarily apply through the MIIT Industrial Energy Conservation and Green Development Management Platform. County-level authorities conduct preliminary reviews and solicit opinions from local ecological environment, emergency management, and market regulation departments before recommending to the municipal bureau. The municipal bureau organizes expert reviews, solicits opinions from relevant municipal departments, and after deliberation by the director's office meeting, determines the annual municipal green factory public announcement list. Those passing the public notice without objection are officially announced.
Regarding whether four management system certificates are mandatory, the answer is no. Enterprises without certificates can first establish and operate the four management systems. Third-party evaluation reports are also not mandatory; self-application is encouraged. The designation is not permanently valid; Hefei implements dynamic management with irregular spot checks and annual reviews. Factories that later have major environmental or safety accidents, serious dishonesty, or significant indicator declines will be removed from the list and have their qualification revoked.
Guidance on Hefei Municipal Enterprise Technology Center Management Measures (Revised)
A Hefei municipal enterprise technology center is a technology research, development and innovation institution established by enterprises based on market competition needs, responsible for formulating corporate technology innovation plans, conducting product technology research and development, creating and applying intellectual property, establishing technology standards systems, gathering and cultivating innovative talent, building collaborative innovation networks, and advancing the full implementation of technology innovation.
The application process involves: enterprises filing through the Hefei "Industrial Brain" platform (accessed via https://hf.ahzwfw.gov.cn/ by entering the Anhui Government Services Network Hefei branch page, expanding the application list, and clicking the "Hefei Industrial Brain" icon) with required documentation; county, district, and development zone industry and information technology departments verifying completeness, authenticity, compliance, and public credit status; the municipal bureau conducting verification and preliminary evaluation based on the Hefei Enterprise Technology Center Evaluation Index System; the municipal bureau, together with the development and reform commission, science and technology bureau, finance bureau, and tax bureau, organizing experts for on-site verification of technology centers scoring 60 points or above; comprehensive assessment based on preliminary results and on-site verification for selection; and joint announcement of recognition results by all participating departments.
Recognition is generally organized annually, with evaluations every three years. The application period is subject to annual work notices. Basic conditions include: prior year main business revenue of at least 20 million yuan; at least 12 R&D personnel including at least 6 full-time; fixed assets of technology development instruments and equipment with original value of at least 3 million yuan (1.5 million yuan for software and information technology services and professional technical services enterprises); at least two new technologies, processes, or products developed in the prior year; and prior year R&D expenditure of at least 2 million yuan.
Qualification may be revoked for: failing the operational evaluation; the enterprise being legally terminated; or major quality, safety, or environmental pollution accidents, tax evasion, export tax fraud, customs law violations, or other illegal and dishonest activities. After revocation due to failed evaluation, county-level authorities cannot recommend the enterprise again for two years. After revocation due to legal termination, major accidents, or serious violations, the enterprise cannot be recommended again for three years. If the technology center undergoes name changes or restructuring, the enterprise must report the changes to the municipal bureau through local authorities within 30 working days.
Guidance on Hefei Municipal Industrial Design Center Recognition and Management Measures
A Hefei municipal industrial design center refers to enterprise industrial design centers and industrial design companies with strong industrial design innovation capabilities, distinctive characteristics, standardized management, and industry-leading or advanced development levels.
The application process involves: enterprises filing through the Hefei "Industrial Brain" platform with supporting documentation; county, district, and development zone authorities verifying materials and credit status; the municipal bureau organizing expert material review and on-site inspections; determining the list based on expert review and inspection results; a five-working-day public notice on the official website; and official announcement of centers passing the public notice without objection.
Recognition follows the principles of voluntary participation, selection of the best, and openness, fairness, and impartiality. It is conducted annually with reviews every two years, subject to annual work notices.
For industrial design centers, basic conditions include: established for at least two years at the time of application with prior year main business revenue of at least 20 million yuan (industrial enterprises must be above designated size); design R&D investment accounting for at least 5% of total enterprise R&D expenditure in the current year; having a highly skilled industrial design leader with at least 15 practitioners, of whom at least 80% hold college diplomas or above, technician or senior technician qualifications, or senior professional technical positions, with at least two holding industrial design-related degrees; and at least 10 authorized patents including copyrights in the past three years, including at least two invention patents related to industrial design products that have been applied in main product manufacturing with significant economic benefits, at least three innovation achievements transformed with good economic and social benefits and declared intellectual property, and participation in at least two domestic or international industrial design competitions or hosting at least one specialized competition.
For industrial design companies, conditions include: established for at least two years with industrial design services as the main business, capable of independently undertaking industrial design tasks, providing design services and systematic design consulting with corresponding track records; prior year annual industrial design service revenue of at least 1 million yuan; at least 10 industrial design practitioners with at least 80% holding college diplomas or above, technician or senior technician qualifications, or senior professional technical positions; and at least two authorized domestic or international patents including copyrights, or at least two national or industry-level industrial design awards.
Qualification may be revoked for: failure to participate in reviews as required; failing review results; voluntary revocation requests by the enterprise; legal termination of the enterprise; or fraud, violations of regulations, or illegal activities. After revocation for failure to participate in reviews, failed reviews, or voluntary requests, applications will not be accepted for two years. After revocation for fraud, violations, or illegal activities, applications will not be accepted for three years. Name changes or restructuring must be reported to the municipal bureau during annual reviews, and the municipal bureau will record the changes in review documents.
Guidance on Telecommunications Base Stations
Mobile communication base stations are infrastructure that ensures mobile phone calls and mobile internet access. Base station coverage radius is limited, and signals attenuate with distance. New generation networks such as 5G require higher base station density. Insufficient base station construction leads to weak signals, slow internet, and poor call quality. Anhui Province is accelerating new generation communication network planning and construction, encouraging public facilities and public areas to open freely to communication facilities, and clarifying that property service enterprises must not obstruct construction or illegally charge fees. Network quality and signal strength are directly related to whether base stations are built and whether there are enough of them, making strengthened base station construction an objective necessity for meeting public communication needs.
Regarding radiation concerns from base stations near residential buildings, radiation is divided into ionizing and non-ionizing radiation. Base stations emit electromagnetic waves, which are non-ionizing radiation that does not cause material ionization, fundamentally different from ionizing radiation such as hospital X-ray examinations. China implements strict national standard controls on base station electromagnetic radiation. Communication base station electromagnetic radiation must comply with the Electromagnetic Environment Control Limits (GB 8702-2014), not exceeding 40 microwatts per square centimeter, with actual construction control values generally kept within 8 microwatts per square centimeter, only one-fifth of the national standard limit, stricter than standards in the United States, European Union, and other countries and regions when compared by corresponding frequency bands. The Ministry of Industry and Information Technology has publicly stated that compared with everyday household appliances such as hair dryers, base station radiation is negligible, and base station electromagnetic radiation meeting national standards will not harm human health.
Regarding rumors that 5G base stations emit more radiation than 4G, this is false. 5G base stations and other standard base stations follow the same national standard, the Electromagnetic Environment Control Limits (GB 8702-2014), with electromagnetic radiation not exceeding 40 microwatts per square centimeter and actual construction control values generally within 8 microwatts per square centimeter. The Ministry of Industry and Information Technology has publicly refuted this: 5G and 4G base stations follow the same national standard and will not exceed limits due to different standards, nor will they harm human health.
Regarding environmental procedures and monitoring data, mobile communication base stations must complete environmental impact registration filing before being built and put into operation, and conduct electromagnetic radiation environmental monitoring after operation. The public can inquire about monitoring results from base station property rights units (basic telecommunications enterprises or tower companies). Those with questions about radiation data can call the 12345 government services hotline for consultation, and relevant departments will provide answers.
On why base stations must be built in residential areas and on rooftops rather than farther away, wireless signals attenuate rapidly with distance, and base station coverage radius is limited. If base stations are built far away, mobile phone signals within coverage areas become weak, and call and internet quality declines accordingly. 5G networks have higher frequencies and smaller coverage radii, requiring more and closer station sites.
Regarding whether telecom companies can build base stations on residential rooftops and whether consent is needed, construction is legally permitted but must follow legal procedures and respect property owner rights. According to Article 46 of the Telecommunications Regulations of the People's Republic of China, basic telecommunications business operators may set up mobile communication base stations and other public telecommunications facilities on civil buildings, but must notify building property owners or users in advance and pay usage fees according to standards set by provincial, autonomous region, or municipal people's governments. Article 51 clearly states that no organization or individual may obstruct or hinder lawful construction. Meanwhile, according to Article 288 of the Civil Code regarding neighboring relations, property owners have a reasonable tolerance obligation for legally compliant base station construction and must not obstruct without cause. Base station installation must also comply with Article 28 of the Telecommunications Construction Management Measures regarding building load and structural safety requirements, strictly prohibiting damage to building main structures, waterproof layers, and fire protection facilities. Damage to buildings caused by improper base station construction or maintenance constitutes a civil tort dispute, which both parties can resolve through negotiation, or through people's mediation and other legal channels if negotiation fails.
Regarding poor mobile phone signals at home and whether operators are in violation, scientific judgment against standards is needed. According to Articles 30 and 38 of the Telecommunications Regulations, telecommunications business operators shall provide services according to national telecommunications service standards and may establish and publish enterprise standards higher than national standards. The Telecommunications Service Specifications specify that digital cellular mobile communication services should allow mobile stations to access the network at 90% of locations within wireless network coverage areas, 99% of the time, within 20 seconds. Due to factors such as building shielding, wireless interference, mobile terminal configuration, and obstructed community base station construction, signal strength varies at different times and locations. Individual areas or occasional poor signals cannot be simply equated with service non-compliance. If there is genuine evidence that services do not meet national standards or enterprise published standards, consumers can request resolution from telecommunications business operators according to Article 39 of the Telecommunications Regulations, and operators should handle it promptly according to law. Telecommunications service agreements and publicly made service commitments by operators are integral parts of contracts, and operators should fully perform obligations according to Article 509 of the Civil Code.
Regarding community property management or owners' committees disagreeing with base station construction, legally constructed base stations are protected by law, and property management and owners' committees must not obstruct without cause. Article 51 of the Telecommunications Regulations stipulates that no organization or individual may prevent or hinder basic telecommunications business operators from lawfully engaging in telecommunications facility construction. Anhui Province is advancing new generation communication network planning and construction, clarifying that public facilities and public areas open freely to communication facilities, and property service enterprises must not obstruct construction or illegally charge fees. For base stations that genuinely need to occupy community public areas, operating enterprises should fulfill advance notification, consultation, and lawful voting procedures. For individual residents opposing or property management refusing to cooperate, the 12345 hotline can be called for consultation, and local industry and information technology (communication development) departments will help coordinate resolution, effectively protecting the community's overall communication rights.
Regarding whether base stations on rooftops or in communities can be dismantled, base stations are public communication infrastructure serving surrounding residents and cannot be dismantled arbitrarily. Articles 48 and 49 of the Telecommunications Regulations stipulate that no unit or individual may arbitrarily alter, relocate, or endanger the safety of telecommunications facilities. Article 51 stipulates that no one may obstruct or hinder lawful construction. If relocation is genuinely needed due to planning adjustments, engineering construction, or other special circumstances, consent from base station property rights owners must be obtained according to law, with costs borne by the unit or individual requesting relocation, and continuous communication services must be ensured. For residents with concerns about base station radiation, they can first inquire about monitoring data from operating enterprises or call the 12345 hotline for consultation. Relevant departments will coordinate professional institutions for monitoring and verification before providing answers. There is no need to directly demand dismantling. Those who believe base station noise or other factors affect normal life can consult ecological environment departments according to relevant provisions of the Environmental Protection Law and the Noise Pollution Prevention and Control Law.
Comments