A 195-kilometre long-distance hydrogen transmission pipeline running from Damao Banner to the urban area of Baotou in Inner Mongolia has officially commenced operation.
The project has been selected as one of the first batch of hydrogen energy pilot projects in the energy sector by the National Energy Administration, filling a domestic gap in large-scale, long-distance pure hydrogen pipeline transmission and set to drive the coordinated development of Baotou's green hydrogen industrial chain spanning production, storage, transmission and utilisation.
According to reports, the 195-kilometre pipeline starts at the hydrogen transmission initial station in Barun Industrial Park in Baotou in the north and ends at a terminal station in Kundulun District in the south, linking the areas north and south of the mountains and connecting both the source and the load ends. It has a design pressure of 6.3 megapascals and an approved annual hydrogen transmission capacity of 100,000 tonnes, with a long-term potential of up to 240,000 tonnes.
Wang Xinyu, Party Secretary and Director of Inner Mongolia Huadian Hydrogen Energy Technology Co., Ltd., said the launch of the pipeline marks a critical step in Baotou's hydrogen energy industry moving from "breakthroughs at individual points" to "connectivity across the entire chain." It effectively enhances green hydrogen supply capacity and reduces transportation costs, with the cost of transporting one kilogram of hydrogen falling from the original 13 yuan to 3 yuan, allowing green hydrogen to better enter the industrial application market.
The pipeline passes through Baiyun Obo Mining District, Damao Banner, Guyang County, Ulat Front Banner of Bayannur City, and Kundulun District, with four stations and six valve chambers along the entire route. It connects the new energy hydrogen production base in northern Baotou with key hydrogen utilisation scenarios in the urban area of Baotou, including chemicals, metallurgy, gas and transportation.
The project spans two cities and five banners, counties and districts, crossing the Daqing Mountains from north to south. Along the route, it crosses six medium-sized rivers, three expressways, three national highways, four provincial roads, two railways, three sections of the Great Wall and two nature reserves.
During construction, the project team adopted technologies including horizontal directional drilling, slurry balance pipe jacking and automatic argon arc welding to overcome challenges such as complex geological crossings, construction in high and steep mountainous areas, and welding protection for high-pressure pure hydrogen pipelines, successfully completing all key control works.
As hydrogen demand along the route continues to grow, the project will effectively promote the large-scale application of green hydrogen in chemicals, metallurgy, hydrogen blending in natural gas, and transportation. It will accumulate practical experience for the large-scale construction and operation of pure hydrogen pipelines in China and provide strong support for accelerating the green and low-carbon energy transition and building a clean, low-carbon, safe and efficient modern energy system.
Comments