Minerals 260 (ASX:MI6) said that all workstreams for a pre-feasibility study are underway for the Bullabulling gold project in Western Australia, which it plans to complete in 2026, targeting first production in 2028, according to a Monday Australian bourse filing.
The workstreams include updated metallurgical test work to optimize recoveries, reagent consumption, grind size, and plant configuration, as well as hydrogeological assessments, mining studies, environmental studies and permitting work, engineering design, and infrastructure studies.
It added that multiple potential sources of water were defined with geophysical surveys planned before drill testing, and previous and ongoing environmental studies indicate that there are no likely barriers to permitting.
Comments