Minerals 260 (ASX:MI6) said drilling at its Bullabulling gold project in Western Australia confirmed the continuity of mineralization within the mineral resource as well as extensions beyond the resource boundaries, according to a Thursday Australian bourse filing.
A further 60 drill holes were drilled at the project, totalling 14,935 meters, including at the Phoenix, Bacchus, and Dicksons deposits. It intersected thick and high-grade mineralization within the footwall lodes at the Phoenix and Bacchus deposits.
This included intercepts of two meters at 8.9 grams per tonne grade of gold from 250 meters, two meters at 7.4 g/t grade of gold from 256 meters, as well as four meters at 10 g/t grade of gold from 111 meters.
Comments