Strong performance from improved production and pricing
Performance highlights
-- Achieved $84/boe realised LNG price during Q3 2026, an increase of 27%
compared to Q2 2026 reflecting price lags from Q2 2026, realised values
from LNG portfolio optimisation undertaken in Q2 2026 and stronger gas
hub market pricing.
-- Delivered quarterly operating revenue of $4,281 million, up 2% on Q2
2026 from strong LNG performance offset by lower average realised pricing
from the liquids portfolio.
-- Delivered quarterly production volumes of 46.2 MMboe (503 Mboe/d), up
12% from Q2 2026 reflecting higher production from Pluto LNG following
turnaround and maintenance activities completed in Q2 2026.
-- Achieved operational reliability of greater than 99% at Sangomar, NWS
Project LNG and Pluto LNG.
-- Completed NWS single train planned major turnaround campaign on
schedule and budget.
Project highlights
-- The Scarborough Energy Project was 99% complete and remains on budget
and on track for first LNG cargo this year.
-- The Trion Project was 71% complete at quarter end and remains on budget,
with floating production unit (FPU) fabrication advancing to 96%
completion, targeting first oil in 2028.
-- The Louisiana LNG Project remains on budget, targeting first LNG in
2029. It is 32% complete with Train 1 41% complete.
Business and portfolio highlights
-- Entered into an agreement to sell Woodside's 70% operated interest in
the Calypso Project to bp.
-- Completed the strategic review of Beaumont New Ammonia (BNA) and will
initiate a formal process to reduce Woodside's investment and achieve
value for shareholders.
PERTH, Australia--(BUSINESS WIRE)--October 20, 2026--
Woodside Energy Group (ASX: WDS) (NYSE: WDS):
2026 full-year
guidance Prior Current Comment
--------------------- --------- ------------ --------- -------------------
Beaumont New
Ammonia volumes
revised to 1.5-2.5
MMboe Narrowing of
window for
Scarborough first
LNG cargo Reduced
production at Okha
FPSO Completion of
start-up and
performance testing
of Julimar
Total production Development Phase 3
volumes(1) MMboe 174--185 174--181 in September
--------------------- --------- ------------ --------- -------------------
Gas hub exposure(2) % 30 No change
--------------------- --------- ------------ --------- -------------------
Capital $ million 4,000--4,500 No change
expenditure(3)
--------------------- --------- ------------ --------- -------------------
Abandonment $ million 500--800 No change
expenditure
--------------------- --------- ------------ --------- -------------------
Exploration $ million 200 No change
expenditure
--------------------- --------- ------------ --------- -------------------
Production costs $ million 1,500--1,800 No change
--------------------- --------- ------------ --------- -------------------
Feed gas, services $ million 500--600 No change
and processing
costs
--------------------- --------- ------------ --------- -------------------
Property, plant and $ million 4,200--4,700 No change
equipment
depreciation and
amortisation
--------------------- --------- ------------ --------- -------------------
Woodside CEO Liz Westcott said the strong third quarter performance reflected the company's highly reliable operations and disciplined execution of major growth projects.
"Amid ongoing volatility in global energy markets, we have remained a reliable supplier to our customers. Increased quarterly operating revenue reflected increased production and strong realised prices.
"We delivered quarterly production of 46.2 million barrels of oil equivalent, up 12% from the previous quarter following the successful completion of the Pluto LNG turnaround in the second quarter and the NWS turnaround in the third quarter.
"We maintained outstanding reliability across our global portfolio, with reliability of 99.8% at Pluto LNG and 99.3% at the NWS Project in Australia, and 99.2% at Sangomar in Senegal.
"We recorded three process safety events during the quarter. Safety remains our highest priority and we are focused on applying the lessons learned from these incidents and strengthening our controls in this vitally important area.
"We continued executing our major growth projects to budget and schedule. The Scarborough Energy Project is now 99% complete, with gas from the Scarborough reservoir introduced into the FPU and exported into the trunkline during the quarter. We remain on track for first LNG cargo this year.
"The Trion Project is now 71% complete and targeting first oil in 2028. Fabrication of the FPU is well advanced, with integration and pre-commissioning activities underway.
"Louisiana LNG is targeting first LNG in 2029, with construction progressing across all three trains and the project 32% complete.
"We continued to optimise our portfolio through the ongoing integration of the Gippsland Basin assets and divestment of our operated interest in the Calypso Project. Following completion of the Beaumont New Ammonia strategic review, we will now initiate a formal process to reduce our investment and achieve value for our shareholders. These actions demonstrate our disciplined approach to portfolio management and capital allocation, with a clear focus on investments that deliver long-term shareholder value.
"We remain committed to supplying Australia's domestic gas market and are assessing our plans for four proposed development wells in the Bass Strait. Development will depend on technical assessments and the implications of the Federal Government's domestic gas reservation scheme."
Comparative performance at a glance
Q3 Q2 Change Q3 Change YTD YTD Change
2026 2026 % 2025 % 2026 2025 %
------------------- ---------- ----- ----- ------ ----- ------ ------ ----- ------
Operating revenue $ million 4,281 4,185 2% 3,359 27% 11,727 9,949 18%
------------------- ---------- ----- ----- ------ ----- ------ ------ ----- ------
Production
volumes(4) MMboe 46.2 41.3 12% 50.8 (9%) 132.7 149.9 (11%)
Gas MMscf/d 1,697 1,326 28% 1,827 (7%) 1,534 1,831 (16%)
Liquids Mbbl/d 202 214 (6%) 231 (13%) 212 228 (7%)
Ammonia kT/d 0.8 1.8 (56%) -- --% 1.3 -- --%
Total Mboe/d 503 454 11% 552 (9%) 486 549 (11%)
------------------- ---------- ----- ----- ------ ----- ------ ------ ----- ------
Sales volumes(5) MMboe 51.1 48.0 6% 55.1 (7%) 150.9 159.9 (6%)
Gas MMscf/d 2,043 1,672 22% 2,122 (4%) 1,910 2,049 (7%)
Liquids Mbbl/d 193 227 (15%) 226 (15%) 213 226 (6%)
Ammonia kT/d 1.0 2.1 (52%) -- --% 1.3 -- --%
Total Mboe/d 555 528 5% 599 (7%) 553 586 (6%)
------------------- ---------- ----- ----- ------ ----- ------ ------ ----- ------
Average realised
price $/boe 84 85 (1%) 60 40% 77 61 26%
------------------- ---------- ----- ----- ------ ----- ------ ------ ----- ------
Capital expenditure
and acquisitions $ million 722 784 (8%) 1,323 (45%) 2,829 3,881 (27%)
Capital
expenditure(6) $ million 722 784 (8%) 1,323 (45%) 2,359 3,881 (39%)
Acquisitions $ million -- -- --% -- --% 470 -- --%
Operations
Pluto LNG
-- Achieved quarterly LNG reliability of 99.8%.
-- Preparation for the subsea tie-in and commissioning of the XNA-03
infill well continued ahead of targeted start-up in Q4 2026.
North West Shelf Project
-- Achieved quarterly LNG reliability of 99.3%.
-- Completed single LNG train planned turnaround campaign in September
2026 on budget and schedule.
-- Hearings on three legal proceedings in the Federal Court of Australia
associated with the NWS Project Extension Commonwealth environmental
approvals were held in July 2026, with the decisions reserved. A separate
proceeding concerning the State environmental approval remains before the
Supreme Court of Western Australia, with a hearing scheduled for Q4
2026.
-- The NWS Project is continuing with infrastructure retirement planning
at Karratha Gas Plant (KGP) while maintaining the capacity to provide
processing services for third-party gas. Planning is underway to retire a
second LNG train in 2027 subject to relevant approvals.
Wheatstone and Julimar-Brunello
-- Progressed towards asset swap transaction completion, including the
satisfaction of certain conditions precedent relating to the following:
-- Completion of the Julimar Development Phase 3 project, with
start-up and performance testing of the final development wells
completed in September 2026.
-- Completion of decommissioning of three Julimar-Brunello
exploration wells, and wellhead severance of a further two
previously-abandoned exploration wells.
-- Subject to the receipt of all regulatory approvals, the asset swap
transaction continues to target completion in Q4 2026.7
Bass Strait
-- Achieved quarterly reliability of 91%.
-- Achieved completion of the five Turrum Phase 3 Project development
wells with first production targeting H1 2027.
-- Progressed integration of the Gippsland Basin assets into Woodside's
operated portfolio following transfer of operatorship from ExxonMobil on
1 July 2026.
Other Australia
-- Following remediation of a subsea mooring system defect and successful
FPSO reconnection, production resumed at Okha, with ongoing well
assessment supporting further production restoration.
-- Subsequent to the period, the Pyrenees floating production storage and
offloading (FPSO) disconnected ahead of scheduled shipyard activity in Q4
2026.
Sangomar
-- Achieved an average daily production rate of 94 Mbbl/d (100% basis, 73
Mbbl/d Woodside share) with reliability of 99.2%.
-- Production rate reflects natural field decline and reduced production
sharing contract (PSC) net entitlement following recovery of 100%
Woodside-funded pre-FID costs.
Gulf of America
-- Achieved quarterly reliability of 94.3% at Shenzi.
-- Executed a planned shutdown at Shenzi in July 2026 and a three-well
intervention campaign in August 2026.
-- Atlantis achieved start-up of the Major Facility Expansion (MFX)
project, bringing the first of two water injectors online. The project
added subsea infrastructure, wells and upgraded water injection
equipment.
Beaumont New Ammonia
-- BNA suspended operations for approximately 30 days following a Tier 1
process safety event. There were no injuries to personnel or damage to
equipment and no lasting impact to the environment. The facility was
safely restarted following completion of an internal investigation and
implementation of appropriate actions.
-- Production during the quarter was constrained to 69% of nameplate
capacity due to third-party feedstock availability and the 30 day shut
down. Third-party cargoes were sourced to satisfy customer commitments on
similar financial terms.
-- Commencement of lower-carbon ammonia production remains targeted for
2027, subject to commissioning of Linde's low-carbon hydrogen facilities
and start-up of ExxonMobil's carbon capture and storage (CCS)
infrastructure. During the quarter, the Texas Railroad Commission voted
to approve the permit for ExxonMobil's Rose carbon storage project,
moving it into the final stages of a multi-year regulatory process.
-- Completed the strategic review of BNA. In light of the evolving pace of
lower-carbon ammonia market development, Woodside will initiate a formal
process to reduce its investment in BNA investment and achieve value for
shareholders.
Marketing
Revenue and trading
-- Strong marketing performance reflected the realisation of value from
LNG portfolio optimisation undertaken in Q2 2026, with revenue recognised
as cargoes were delivered in Q3 2026.
-- Average realised LNG prices improved quarter-on-quarter, reflecting the
realisation of price lags from Q2 2026 and stronger gas hub market
pricing in the lead up to northern hemisphere winter months.
-- Approximately 33% of LNG sold was linked to gas hub indices during the
quarter.
-- The impact of crude supply disruptions softened during the quarter as
export flows recovered and market balances improved, resulting in lower
market prices for crude oil and weaker realised premiums for the liquids
portfolio (oil, condensate and liquids traded).
Pipeline gas
-- Executed incremental pipeline gas sales of:
-- 12.9 PJ to be delivered to the Western Australian market from
2027 to 2029
-- 18.4 PJ to be delivered to the East Coast market from 2026 to
2028.
-- Progressed expression of interest for 20 PJ of Bass Strait supply and
finalised a number of 2027 and 2028 offers during the period.
Projects
Scarborough Energy Project
-- The Scarborough and Pluto Train 2 projects remain on budget and were
99% complete at the end of the quarter (excluding Pluto Train 1
modifications).
-- The FPU and subsea production system commissioning and start-up
activities continued, including well clean-up and export of gas to
pressurise the trunkline. Well clean-up results are in line with
reservoir and well performance expectations.
-- Completed all mechanical runs of Pluto Train 2 compressors and,
subsequent to the period, Scarborough gas was introduced to the warm end
(gas pre-treatment) of the LNG train. Activities in the cold end continue
to progress, which will enable the commencement of gas liquefaction.
-- Following the Pluto Train 1 planned major maintenance campaign in Q2,
modifications to Pluto Train 1 which will allow processing of Scarborough
gas continued. The final module arrived onsite with activities focused on
module hook-up and integration.
-- First LNG cargo is on track for Q4 2026.
Trion
-- The Trion Project remains on budget and was 71% complete at the end of
the quarter.
-- Advanced the drilling campaign, with 10 of 24 wells drilled and the
first subsea tree installed.
-- Delivered subsea equipment and disconnectable turret mooring $(DTM)$ buoy
to Mexico and commenced offshore installation.
-- The FPU fabrication reached 96% completion, with integration and
pre-commissioning activities underway.
-- Progressed floating storage and offloading vessel construction,
including completion of DTM turret integration into the hull.
-- The project is targeting first oil in 2028.
Louisiana LNG
-- The Louisiana LNG Project remains on budget and was 32% complete at the
end of the quarter.
-- LNG terminal construction advanced across marine, site works and LNG
tanks, with LNG Tank 1 wall concrete reaching 50% completion.
-- Train 1 was 41% complete at the end of the quarter, with structural
steel and above-ground piping installation progressed.
-- Trains 2 and 3 were 27% and 22% complete respectively at the end of the
quarter, with above-ground piping installation commenced for Train 2 and
first concrete foundation poured for Train 3.
-- Structural steel supply challenges associated with ongoing disruptions
in the Middle East continue to be mitigated through alternative logistics
routes and fabrication sources.
-- Ongoing engagement with high-quality counterparties for equity
participation and LNG offtake continues.
-- The project is targeting first LNG in 2029.
Hydrogen Refueller @H2Perth
-- Ready for start-up was achieved and commissioning activities continued
onsite with first hydrogen production targeting Q4 2026.8
Decommissioning
-- Completed the plug and abandonment (P&A) of five wells in the
Julimar-Brunello and NWS gas fields.
-- Commenced offshore wellhead severance across the NWS gas, NWS oil and
Julimar-Brunello fields, with nine wellheads removed.
-- Continued progress across the Gippsland Basin Joint Venture wells P&A
campaign, including conductor recovery activities at the Cobia field,
completion of preparatory work for the Snapper campaign and commencement
of the Barracouta A P&A campaign.
-- Progressed execution readiness for the offshore Echo Yodel pipeline
removal campaign.
-- Submitted and secured NOPSEMA acceptance of Enfield decommissioning
project close-out documentation.
Development and exploration
Browse
-- The Browse to North West Shelf Project continues to advance technical
definition, regulatory approvals and commercial agreements as part of
pre-front end engineering design activities.
-- Continued engagement with regulators to progress environmental
approvals. Following submission of the revised Environmental Protection
and Biodiversity Conservation Act 1999 referral, the Commonwealth
regulator has determined that the Browse Carbon Capture and Storage (CCS)
Project will be assessed by Environmental Impact Statement.
-- Progressed market engagement for the design and construction of the
FPSO facilities and engineering studies of downstream modifications
required for processing Browse gas at Karratha Gas Plant.
Sunrise
-- The Sunrise Joint Venture reached alignment with the Governments of
Timor-Leste and Australia on the key principles underpinning a new
Greater Sunrise PSC and associated fiscal framework.
-- The terms of the existing PSCs (JPDA PSC 03-19 and JPDA PSC 03-20) were
extended to 31 March 2027 to facilitate implementation of the new PSC
arrangements.
Calypso
-- On 6 August 2026, Woodside entered an agreement to sell its 70%
operated interest in the Calypso Project to bp.9
-- All key conditions precedent have now been met, with completion of the
transaction targeting Q4 2026.
Exploration
-- The Nasim-1X well, operated by ENI, was spud on the Tiba license in
Egypt in August 2026 and drilling activities are ongoing. Woodside holds
a 40% non-operated interest.
-- Woodside was awarded one lease in the US Gulf of America where Woodside
was the successful bidder from the Big Beautiful Gulf 3 Lease Sale held
in August 2026.
-- Entered a non-binding memorandum of understanding with Petr leos
Mexicanos (PEMEX) to evaluate deepwater opportunities in the Gulf of
Mexico.
Corporate activities
Cost reduction
-- Woodside continued to progress the cost reduction program during the
quarter, focused on improving efficiency and productivity.
-- Initiatives underway include simplifying organisational structures,
improving maintenance and contracting processes, and expanding the use of
automation and AI.
-- The program is targeting to deliver a US$350 million structurally lower
recurring cost base against the 2025 baseline from 2028.
Climate and sustainability
-- Three process safety events were recorded during the quarter.
-- A Tier 1 event at BNA (refer to the BNA section for details).
-- Two Tier 2 events involving:
-- a marine diesel oil release during flushing operations at
Okha, which had no environmental impact as the release was
contained.
-- a methane release from pipework during turnaround
activities at KGP.
-- The Sam Houston Jones State Park Project, a voluntary environmental and
biodiversity restoration initiative located 15 miles from LALNG, has
progressed, with approximately 50% of site preparation completed ahead of
seedling planting.
Hedging
-- As at 30 September 2026, approximately 87% of the 30 MMboe of 2026
oil-linked production previously hedged (at an average price of $74.23
per barrel) had been cash settled. No additional oil-linked corporate
hedges were entered during the quarter and the 2027 hedge position of 10
MMboe remains unchanged.
-- Continued to utilise Henry Hub and TTF commodity swaps in connection
with overall management of Corpus Christi LNG volumes.
-- For 2026 year to date, hedge settlements resulted in a net cash outflow
of approximately $565 million, and a reduction to pre-tax profit of $519
million. Cash settlements on oil-linked hedges occur in advance of the
related profit and loss impact, resulting in temporary differences.
Embedded commodity derivative
-- In 2023, Woodside entered a revised long-term gas sale and purchase
contract with Perdaman. A component of the selling price is linked to the
price of urea, creating an embedded commodity derivative in the contract.
The fair value of the embedded derivative is estimated using a Monte
Carlo simulation model.
-- As there is no long-term urea forward curve, TTF continues to be used
as a proxy to simulate the value of the derivative over the life of the
contract.
-- For 2026 year to date, an unrealised pre-tax loss of approximately $179
million is expected to be recognised through other expense.
Funding and liquidity
-- During the quarter Woodside paid a fully franked dividend of $1,084
million and an $800 million bond maturity in September.
-- As at 30 September 2026, Woodside had liquidity of approximately $7,800
million and net debt (including lease liabilities) of approximately
$8,900 million.
Capital Markets Day
-- Woodside's 2026 Capital Markets Day will be held on Thursday, 5
November 2026, commencing at 10:00 am AEDT/7:00 am AWST/5:00 pm CST
(Wednesday, 4 November 2026).
-- A live webcast of the Australian event will be available on Woodside's
website at https://meetings.lumiconnect.com/300-191-159-742.
-- This will be followed by a US Capital Markets Day on 12 November 2026
in New York.
Upcoming events 2026-2027
November 5 2026 Capital Markets Day (Australia)
--------- -----------------------------------------
12 2026 Capital Markets Day (United States)
--------- -----------------------------------------
January 28 Fourth Quarter Report
--------- -----------------------------------------
February 23 2026 Annual Report
--------- -----------------------------------------
April 21 First Quarter Report
--------- -----------------------------------------
Production volumes
Q3 Q2 Q3 YTD YTD
2026 2026 2025 2026 2025
---------------------------- -------- ----- ----- ----- ----- -----
Gas MMscf/d 1,697 1,326 1,827 1,534 1,831
Liquids Mbbl/d 202 214 231 212 228
Ammonia kT/d 0.8 1.8 -- 1.3 --
---------------------------- -------- ----- ----- ----- ----- -----
Total production volumes Mboe/d 503 454 552 486 549
---------------------------- -------- ----- ----- ----- ----- -----
Production (reserves)
Q3 Q2 Q3 YTD YTD
2026 2026 2025 2026 2025
------------------------- ------- ------ ------ ------ ------ ------
AUSTRALIA
LNG
North West Shelf Mboe 5,646 5,491 5,895 16,815 17,665
Pluto(10) Mboe 12,516 7,701 12,118 31,208 33,272
Wheatstone Mboe 1,338 1,454 2,677 5,078 7,523
------------------------- ------- ------ ------ ------ ------ ------
Total Mboe 19,500 14,646 20,690 53,101 58,460
------------------------- ------- ------ ------ ------ ------ ------
Pipeline gas
Bass Strait Mboe 4,416 3,440 3,929 10,612 10,774
Other(10,11) Mboe 2,862 2,510 3,830 7,880 11,450
------------------------- ------- ------ ------ ------ ------ ------
Total Mboe 7,278 5,950 7,759 18,492 22,224
------------------------- ------- ------ ------ ------ ------ ------
Crude oil and condensate
North West Shelf Mbbl 1,054 949 1,093 2,956 3,111
Pluto(10) Mbbl 889 602 980 2,336 2,717
Wheatstone Mbbl 239 271 471 937 1,331
Bass Strait Mbbl 552 477 505 1,371 1,364
Macedon & Pyrenees Mbbl 263 169 347 793 1,274
Ngujima-Yin Mbbl 659 684 960 1,996 2,769
Okha Mbbl 7 - 575 318 1,474
------------------------- ------- ------ ------ ------ ------ ------
Total Mboe 3,663 3,152 4,931 10,707 14,040
------------------------- ------- ------ ------ ------ ------ ------
NGL
North West Shelf Mbbl 216 191 258 588 695
Pluto(10) Mbbl 45 28 58 112 152
Bass Strait Mbbl 772 761 842 2,163 2,263
------------------------- ------- ------ ------ ------ ------ ------
Total Mboe 1,033 980 1,158 2,863 3,110
------------------------- ------- ------ ------ ------ ------ ------
Total Australia Mboe 31,474 24,728 34,538 85,163 97,834
------------------------- ------- ------ ------ ------ ------ ------
Mboe/d 342 272 375 312 358
--------------------------------- ------ ------ ------ ------ ------
Q3 Q2 Q3 YTD YTD
2026 2026 2025 2026 2025
--------------------------- ------- ------ ------ ------ ------- -------
INTERNATIONAL
Pipeline gas
USA Mboe 358 405 491 1,209 1,278
Trinidad & Tobago Mboe - - 242 - 4,863
Other(12) Mboe - - 6 9 34
--------------------------- ------- ------ ------ ------ ------- -------
Total Mboe 358 405 739 1,218 6,175
--------------------------- ------- ------ ------ ------ ------- -------
Crude oil and condensate
Atlantis Mbbl 2,424 2,526 2,783 7,671 7,859
Mad Dog Mbbl 2,710 2,704 2,310 8,172 7,357
Shenzi Mbbl 1,667 1,859 2,088 5,422 6,431
Trinidad & Tobago Mbbl - - 13 - 205
Sangomar Mbbl 6,758 7,854 7,516 21,764 21,922
Other(12) Mbbl 35 35 5 124 5
--------------------------- ------- ------ ------ ------ ------- -------
Total Mboe 13,594 14,978 14,715 43,153 43,779
--------------------------- ------- ------ ------ ------ ------- -------
NGL
USA Mbbl 276 370 442 1,159 1,238
Other(12) Mbbl - - 3 5 18
--------------------------- ------- ------ ------ ------ ------- -------
Total Mboe 276 370 445 1,164 1,256 --------------------------- ------- ------ ------ ------ ------- ------- Total International Mboe 14,228 15,753 15,899 45,535 51,210 --------------------------- ------- ------ ------ ------ ------- ------- Mboe/d 155 173 173 167 188 ----------------------------------- ------ ------ ------ ------- ------- Total production (reserves) volumes Mboe 45,702 40,481 50,437 130,698 149,044 --------------------------- ------- ------ ------ ------ ------- ------- Mboe/d 497 445 548 479 546 ----------------------------------- ------ ------ ------ ------- -------
Production (processing)
Q3 Q2 Q3 YTD YTD
2026 2026 2025 2026 2025
--------------------------- ------- ------ ------ ------ ------- -------
AUSTRALIA
Pluto-KGP
Interconnector(13)
LNG Mboe 254 171 210 667 583
Pipeline gas Mboe - - 91 - 253
Crude oil and condensate Mbbl 8 6 9 23 28
NGL Mbbl 5 3 7 12 17
--------------------------- ------- ------ ------ ------ ------- -------
Total Australia Mboe 267 180 317 702 881
--------------------------- ------- ------ ------ ------ ------- -------
Mboe/d 3 2 3 3 3
----------------------------------- ------ ------ ------ ------- -------
INTERNATIONAL
Beaumont New Ammonia(14) Mboe 266 609 - 1,292 -
--------------------------- ------- ------ ------ ------ ------- -------
Total International Mboe 266 609 - 1,292 -
--------------------------- ------- ------ ------ ------ ------- -------
Mboe/d 3 7 - 5 -
----------------------------------- ------ ------ ------ ------- -------
Total production
(processing) volumes Mboe 533 789 317 1,994 881
--------------------------- ------- ------ ------ ------ ------- -------
Mboe/d 6 9 3 7 3
----------------------------------- ------ ------ ------ ------- -------
Total production volumes Mboe 46,235 41,270 50,754 132,692 149,925
--------------------------- ------- ------ ------ ------ ------- -------
Mboe/d 503 454 552 486 549
----------------------------------- ------ ------ ------ ------- -------
Sales volumes
Q3 Q2 Q3 YTD YTD
2026 2026 2025 2026 2025
----------------------- -------- ----- ----- ----- ----- -----
Gas MMscf/d 2,043 1,672 2,122 1,910 2,049
Liquids Mbbl/d 193 227 226 213 226
Ammonia kT/d 1.0 2.1 -- 1.3 --
----------------------- -------- ----- ----- ----- ----- -----
Total sales volumes Mboe/d 555 528 599 553 586
----------------------- -------- ----- ----- ----- ----- -----
Q3 Q2 Q3 YTD YTD
2026 2026 2025 2026 2025
------------------------- ------- ------ ------ ------ ------ ------
AUSTRALIA
LNG
North West Shelf Mboe 5,630 3,922 4,743 17,016 16,689
Pluto Mboe 13,146 9,011 13,609 34,062 35,254
Wheatstone Mboe 1,967 1,995 1,623 6,578 7,186
------------------------- ------- ------ ------ ------ ------ ------
Total Mboe 20,743 14,928 19,975 57,656 59,129
------------------------- ------- ------ ------ ------ ------ ------
Pipeline gas
Bass Strait Mboe 4,277 3,736 4,070 10,579 10,989
Other(15) Mboe 3,152 2,756 4,028 8,406 11,445
------------------------- ------- ------ ------ ------ ------ ------
Total Mboe 7,429 6,492 8,098 18,985 22,434
------------------------- ------- ------ ------ ------ ------ ------
Crude oil and condensate
North West Shelf Mbbl 651 1,300 1,194 2,633 3,039
Pluto Mbbl 775 1,011 1,338 2,978 2,693
Wheatstone Mbbl 92 427 417 787 1,402
Bass Strait Mbbl 593 619 531 1,740 1,664
Ngujima-Yin Mbbl 690 963 1,171 2,322 2,985
Okha Mbbl - - - 251 1,256
Macedon & Pyrenees Mbbl - 511 496 512 1,493
------------------------- ------- ------ ------ ------ ------ ------
Total Mboe 2,801 4,831 5,147 11,223 14,532
------------------------- ------- ------ ------ ------ ------ ------
NGL
North West Shelf Mbbl - 473 430 473 907
Pluto Mbbl - 93 105 93 215
Bass Strait Mbbl 874 437 374 2,177 1,610
------------------------- ------- ------ ------ ------ ------ ------
Total Mboe 874 1,003 909 2,743 2,732
------------------------- ------- ------ ------ ------ ------ ------
Total Australia Mboe 31,847 27,254 34,129 90,607 98,827
------------------------- ------- ------ ------ ------ ------ ------
Mboe/d 346 299 371 332 362
--------------------------------- ------ ------ ------ ------ ------
Q3 Q2 Q3 YTD YTD
2026 2026 2025 2026 2025
--------------------------- ------- ------ ------ ------ ------- -------
INTERNATIONAL
Pipeline gas
USA(16) Mboe 361 413 438 1,160 1,246
Trinidad & Tobago Mboe - - 243 - 4,750
Other(17) Mboe 45 3 4 51 12
--------------------------- ------- ------ ------ ------ ------- -------
Total Mboe 406 416 685 1,211 6,008
--------------------------- ------- ------ ------ ------ ------- -------
Crude oil and condensate
Atlantis Mbbl 2,400 2,544 2,801 7,672 7,901
Mad Dog Mbbl 2,605 2,780 2,310 8,118 7,415
Shenzi Mbbl 1,415 1,870 2,094 5,179 6,326
Trinidad & Tobago Mbbl - - 5 - 181
Sangomar Mbbl 6,932 6,865 6,833 20,619 20,859
Other(17) Mbbl 130 67 47 286 151
--------------------------- ------- ------ ------ ------ ------- -------
Total Mboe 13,482 14,126 14,090 41,874 42,833
--------------------------- ------- ------ ------ ------ ------- -------
NGL
USA Mbbl 254 389 440 1,165 1,196
Other(17) Mbbl 29 1 2 32 6
--------------------------- ------- ------ ------ ------ ------- -------
Total Mboe 283 390 442 1,197 1,202
--------------------------- ------- ------ ------ ------ ------- -------
Ammonia
Beaumont New Ammonia(18) Mboe 346 702 - 1,297 -
--------------------------- ------- ------ ------ ------ ------- -------
Total Mboe 346 702 - 1,297 -
--------------------------- ------- ------ ------ ------ ------- -------
Total International Mboe 14,517 15,634 15,217 45,579 50,043
--------------------------- ------- ------ ------ ------ ------- -------
Mboe/d 158 172 165 167 183
----------------------------------- ------ ------ ------ ------- -------
MARKETING(19)
LNG Mboe 4,389 4,856 5,492 13,645 10,579
Liquids Mboe 341 298 249 1,023 417
--------------------------- ------- ------ ------ ------ ------- -------
Total Mboe 4,730 5,154 5,741 14,668 10,996
--------------------------- ------- ------ ------ ------ ------- -------
Total Marketing Mboe 4,730 5,154 5,741 14,668 10,996
--------------------------- ------- ------ ------ ------ ------- -------
Total sales volumes Mboe 51,094 48,042 55,087 150,854 159,866
--------------------------- ------- ------ ------ ------ ------- -------
Mboe/d 555 528 599 553 586
----------------------------------- ------ ------ ------ ------- -------
Operating revenue (US$ million)
Q3 Q2 Q3 YTD YTD
2026 2026 2025 2026 2025
-------------------------------- ----- ----- ----- ------ -----
AUSTRALIA
North West Shelf 479 378 323 1,305 1,153
Pluto 1,121 795 1,000 2,682 2,539
Wheatstone 189 167 135 536 589
Bass Strait 380 352 265 964 776
Macedon 56 57 44 169 148
Ngujima-Yin 73 102 88 223 231
Okha - 2 - 27 90
Pyrenees - 45 37 45 120
-------------------------------- ----- ----- ----- ------ -----
Revenue from sale of products 2,298 1,898 1,892 5,951 5,646
Intersegment revenue (53) (51) (67) (154) (76)
Processing and services revenue 34 35 39 122 148
-------------------------------- ----- ----- ----- ------ -----
Total Australia 2,279 1,882 1,864 5,919 5,718
-------------------------------- ----- ----- ----- ------ -----
INTERNATIONAL
Atlantis 215 258 196 672 568
Mad Dog 227 272 150 689 501
Shenzi 120 192 142 450 447
Trinidad & Tobago(20) - - 6 - 150
Sangomar 659 763 477 1,946 1,468
Other(21) 44 145 2 231 9
-------------------------------- ----- ----- ----- ------ -----
Revenue from sale of products 1,265 1,630 973 3,988 3,143
-------------------------------- ----- ----- ----- ------ -----
Total International 1,265 1,630 973 3,988 3,143
-------------------------------- ----- ----- ----- ------ -----
MARKETING
Revenue from sale of products 672 620 452 1,652 996
Intersegment revenue 53 51 67 154 76
Shipping and other revenue 12 2 3 14 16
-------------------------------- ----- ----- ----- ------ -----
Total Marketing(22) 737 673 522 1,820 1,088
-------------------------------- ----- ----- ----- ------ -----
Operating revenue(23) 4,281 4,185 3,359 11,727 9,949
-------------------------------- ----- ----- ----- ------ -----
Realised prices
Q3 Q2 Q3 Q3 Q2 Q3
Units 2026 2026 2025 Units 2026 2026 2025
-------------------- -------- ---- ----- ----- ----- ----- ----- -----
LNG produced $/MMBtu 13.3 10.5 9.5 $/boe 84 66 60
LNG traded(24) $/MMBtu 16.6 15.2 11.2 $/boe 108 99 71
Pipeline gas:
Western Australia A$/GJ 6.9 6.9 6.8
East Coast
Australia A$/GJ 15.3 15.7 12.9
International(25) $/Mcf 2.6 3.0 3.6
Pipeline gas $/boe 49 50 38
Oil and condensate $/bbl 93 107 68 $/boe 93 107 68
NGL $/bbl 52 57 41 $/boe 52 57 41
Liquids traded(24) $/bbl 71 110 60 $/boe 71 110 60
Average realised
price $/boe 84 85 60
Dated Brent $/bbl 97 105 69
JCC (lagged three
months) $/bbl 111 67 75
WTI $/bbl 86 93 65
JKM $/MMBtu 18.9 17.5 12.5
TTF $/MMBtu 18.0 16.4 11.7
Capital expenditure (US$ million)
Q3 Q2 Q3 YTD YTD
2026 2026 2025 2026 2025
------------------------------------- ------- ----- ----- ------- -------
Evaluation capitalised(26) 12 15 8 36 37
Property plant & equipment 1,738 1,557 1,530 4,981 5,902
Cash contributions from participants (1,029) (878) (222) (2,754) (2,092)
Other(27) 1 90 7 96 34
------------------------------------- ------- ----- ----- ------- -------
Capital expenditure 722 784 1,323 2,359 3,881
------------------------------------- ------- ----- ----- ------- -------
Acquisitions - - - 470 -
------------------------------------- ------- ----- ----- ------- -------
Total capital expenditure and
acquisitions 722 784 1,323 2,829 3,881
------------------------------------- ------- ----- ----- ------- -------
Q3 Q2 Q3 YTD YTD
2026 2026 2025 2026 2025
------------------------------------- ------- ----- ----- ------- -------
Scarborough 186 290 361 751 1,016
Trion 267 275 291 713 698
Louisiana LNG capital expenditure 967 723 498 2,562 3,153
Cash contributions from
participants (1,029) (878) (222) (2,754) (2,092)
Louisiana LNG other(27) 7 26 - 38 -
Louisiana LNG(28) (55) (129) 276 (154) 1,061
Other 324 348 395 1,049 1,106
------------------------------------- ------- ----- ----- ------- -------
Capital expenditure 722 784 1,323 2,359 3,881
------------------------------------- ------- ----- ----- ------- -------
Other expenditure (US$ million)
Q3 Q2 Q3 YTD YTD
Exploration and evaluation expenditure 2026 2026 2025 2026 2025
---------------------------------------- ----- ----- ----- ----- -----
Exploration capitalised(26,29) 3 2 17 45 22
Exploration and evaluation expensed(30) 63 50 46 163 127
Permit amortisation 2 2 2 6 5
---------------------------------------- ----- ----- ----- ----- -----
Total 68 54 65 214 154
---------------------------------------- ----- ----- ----- ----- -----
Q3 Q2 Q3 YTD YTD
Trading costs 2026 2026 2025 2026 2025
---------------------------------------- ----- ----- ----- ----- -----
Australia 83 52 71 184 159
International 14 - - 14 -
Marketing 407 533 374 1,278 696
---------------------------------------- ----- ----- ----- ----- -----
Total 504 585 445 1,476 855
---------------------------------------- ----- ----- ----- ----- -----
Q3 Q2 Q3 YTD YTD
Abandonment expenditure 2026 2026 2025 2026 2025
---------------------------------------- ----- ----- ----- ----- -----
Total 172 139 141 427 658
---------------------------------------- ----- ----- ----- ----- -----
Exploration or appraisal wells drilled
Actual
Water well
Permit Spud depth depth
Region area Well Target Interest (%) date (m) (m)(31) Remarks
------- ------- --------- ------- ----------------- ------- ----- ------- ---------
25
August Drilling,
Egypt Tiba Nasim-1X Gas 40% Non-operator 2026 -1 2,650 onshore
------- ------- --------- ------- ----------------- ------- ----- ------- ---------
Permits and licences
Key changes to permit and licence holdings during the quarter ended 30 September 2026 are noted below.
Permits or licence Change in Current
Region areas interest (%) interest (%) Remarks
-------------- ------------------ ------------- ------------- ------------
United States AC 125, AC 126 (45%) --% Assigned
------------------ ------------- ------------- ------------
GB 721, GC 598, AC
36, AC 80, AC 81 (100%) --% Relinquished
EB 682 100% 100% Awarded
Production rates
Average daily production rates (100% project) for the quarter ended 30 September 2026:
Woodside Production rate
share(32) (100% project, Mboe/d) Remarks
Q3 Q2
2026 2026
---------------- ---------------- ------------ ----------- ---------------
AUSTRALIA
NWS Project
Increased
production
driven by
reliability and
wells returned
LNG 29.17% 210 203 to service.
Crude oil and
condensate 29.26% 39 35
NGL 29.36% 8 7
Pluto LNG
Production
higher
following
planned
maintenance
turnaround in
LNG 90.00% 124 75 Q2.
Crude oil and
condensate 90.00% 10 7
Pluto-KGP
Interconnector
Production
higher due to
major
turnaround in
Q2 which
impacted feed
LNG 100.00% 28 19 gas.
Crude oil and
condensate 100.00% 1 1
NGL 100.00% 1 --
Wheatstone(33)
Julimar
Brunello
production
lower due to
impact of
offshore
project
LNG 6.00% 243 204 activities.
Crude oil and
condensate 8.12% 32 28
Bass Strait
Production
higher due to
seasonal
increases in
Pipeline gas 48.95% 98 83 demand.
Crude oil and
condensate 43.61% 14 12
NGL 44.96% 19 18
Australia Oil
Okha
reconnected
Ngujima-Yin 60.00% 12 13 late in Q3.
Okha 50.00% -- --
Pyrenees 71.43% 4 3
Other
Pipeline gas(34) 31 28
Woodside Production rate
share(35) (100% project, Mboe/d) Remarks
Q3 Q2
2026 2026
---------------- ---------------- ------------ ----------- ---------------
INTERNATIONAL
Atlantis
Production
lower due to
higher planned
Crude oil and and unplanned
condensate 38.50% 68 72 events.
NGL 38.50% 3 5
Pipeline gas 38.50% 7 8
Mad Dog
Crude oil and
condensate 20.86% 141 142
NGL 20.86% 5 5
Pipeline gas 20.86% 4 3
Shenzi
Production
lower because
of planned
shutdown and
Crude oil and well
condensate 64.55% 28 32 interventions.
NGL 64.65% 1 2
Pipeline gas 64.64% 1 1
Sangomar
Production
lower due to
natural field
Crude oil 78.01%(36) 94 99 decline.
Beaumont New
Ammonia
Production
lower due to
unplanned
Ammonia(37) 100.00% 3 7 event.
Disclaimer and important notice
Forward looking statements
This report contains forward-looking statements. These statements may relate to Woodside's business, goals, targets, aspirations, plans, expectations, market conditions, results of operations and financial condition, including but not limited to, statements regarding the timing, completion and outcomes of transactions, construction costs and capital expenditures, supply and demand for Woodside's products, development, completion and execution of Woodside's projects, the expected benefits, cash flows and rates of return or other future results of investments, strategies and transactions, the payment of future dividends and the amount thereof, future results of projects, operating activities and new energy products, expectations and plans for renewables production capacity and investments in, and development of, renewables projects, expectations and guidance with respect to production, production costs and other costs, capital expenditure, abandonment expenditure, exploration expenditure and gas hub exposure, trends in commodity prices and currency exchange rates, adoption and implementation of new technologies and expectations regarding the achievement of Woodside's Scope 1 and 2 greenhouse gas emissions target (in each case on a net equity or gross equity basis as specified) and other climate and sustainability goals. All statements, other than statements of historical or present facts, are forward-looking statements and generally may be identified by the use of forward-looking words such as "aim", "anticipate", "aspire", "believe", "enable", "estimate", "expect", "forecast", "foresee", "guidance", "intend", "likely", "may", "objective", "outlook", "pathway", "plan", "position", "potential", "project", "schedule", "seek", "should", "strategy", "strive", "target", "will" and other similar words or expressions.
Forward-looking statements in this report are not guarantees of future events or performance, but are in the nature of future expectations that are based on management's current expectations and assumptions. Those statements and any assumptions on which they are based are subject to change without notice and are subject to inherent known and unknown risks, uncertainties, contingencies and other factors, many of which are beyond the control of Woodside, its related bodies corporate and their respective officers, directors, employees, advisers or representatives. Important factors that could cause actual results to differ materially from those in the forward-looking statements and the assumptions on which they are based include, but are not limited to, fluctuations in commodity prices, actual demand for Woodside products, currency fluctuations, geotechnical factors, drilling and production results, gas commercialisation, development progress, operating results, engineering estimates, reserve and resource estimates, loss of market, industry competition, pace of technology developments, sustainability and environmental risks, climate related transition and physical risks, safety and personnel risks, changes in accounting standards, economic and financial markets conditions in various countries and regions, the actions of third parties, project delay or advancement, regulatory approvals, political risks and the impact of armed conflict and political instability (such as the ongoing conflicts in Ukraine and in the Middle East) on economic activity and oil and gas supply and demand, cost estimates, legislative, fiscal and regulatory developments, including those related to the imposition of tariffs and other trade restrictions, and the effect of future regulatory or legislative actions on Woodside or the industries in which it operates, including potential changes to tax laws, the impact of general economic conditions, inflationary conditions, prevailing exchange rates and interest rates and conditions in financial markets and risks associated with acquisitions, mergers, divestitures, and joint ventures, including difficulties integrating or separating businesses, uncertainty associated with financial projections, restructuring, increased costs and adverse tax consequences, and uncertainties and liabilities associated with acquired and divested properties and businesses.
A more detailed summary of the key risks relating to Woodside and its business can be found in the "Risk factors" section of Woodside's most recent Annual Report released to the Australian Securities Exchange and in Woodside's most recent Annual Report on Form 20-F filed with the United States Securities and Exchange Commission and available on the Woodside website at https://www.woodside.com/investors/reports-investor-briefings. You should review and have regard to these risks when considering the information contained in this report.
If any of the assumptions on which a forward-looking statement is based were to change or be found to be incorrect, this would likely cause outcomes to differ from the statements made in this report.
Investors are strongly cautioned that forward-looking statements are subject to significant uncertainties and may not prove to be correct. Actual results or performance may vary materially from those expressed in, or implied by, any forward-looking statements. None of Woodside nor any of its related bodies corporate, nor any of their respective officers, directors, employees, advisers or representatives, nor any person named in this report or involved in the preparation of the information in this report, makes any representation, assurance, guarantee or warranty (either express or implied) as to the accuracy or likelihood of fulfilment of any forward-looking statement, or any outcomes, events or results expressed or implied in any forward-looking statement in this report. All forward-looking statements contained in this report reflect Woodside's views held as at the date of this report and, except as required by applicable law, neither Woodside, its related bodies corporate, nor any of their respective officers, directors, employees, advisers or representatives nor any person named in this report or involved in the preparation of the information in this report intends to, undertakes to, or assumes any obligation to, provide any additional information or update or revise any of these statements after the date of this report, either to make them conform to actual results or as a result of new information, future events or results, changes in Woodside's expectations or otherwise. Past performance (including historical financial and operational information) is given for illustrative purposes only. It is not necessarily a reliable indicator of future performance, including future security prices.
Other important information
Unless otherwise stated, all:
-- figures are Woodside share for the quarter ending 30 September 2026;
-- references to dollars, cents or $ in this report are to US currency;
and
-- references to 'Woodside', 'the company', 'the Group', 'we', 'us' and
'our' refer to Woodside Energy Group Ltd and its controlled entities as a
whole.
Glossary, units of measure and conversion factors
Refer to the Glossary in the Half-Year Report 2026 for definitions, including carbon related definitions.
Product Unit Conversion factor -------------------- --------------- ------------------ Natural gas 5,700 scf 1 boe -------------------- --------------- ------------------ Condensate 1 bbl 1 boe -------------------- --------------- ------------------ Oil 1 bbl 1 boe -------------------- --------------- ------------------ Natural gas liquids 1 bbl 1 boe -------------------- --------------- ------------------ Ammonia 1 metric tonne 3.68 boe -------------------- --------------- ------------------ Facility Unit LNG Conversion factor -------------------- -------- ---------------------- Karratha Gas Plant 1 tonne 8.08 boe -------------------- -------- ---------------------- Pluto LNG Gas Plant 1 tonne 8.34 boe -------------------- -------- ---------------------- Wheatstone 1 tonne 8.27 boe -------------------- -------- ----------------------
The LNG conversion factor from tonne to boe is specific to volumes produced at each facility and is based on gas composition which may change over time.
Term Definition -------- ------------------------------------------- bbl barrel -------- ------------------------------------------- bcf billion cubic feet of gas -------- ------------------------------------------- boe barrel of oil equivalent -------- ------------------------------------------- GJ gigajoule -------- ------------------------------------------- kT thousand metric tonnes -------- ------------------------------------------- kT/d thousand metric tonnes per day -------- ------------------------------------------- NGL natural gas liquid -------- ------------------------------------------- Mbbl thousand barrels -------- ------------------------------------------- Mbbl/d thousand barrels per day -------- ------------------------------------------- Mboe thousand barrels of oil equivalent -------- ------------------------------------------- Mboe/d thousand barrels of oil equivalent per day -------- ------------------------------------------- Mcf thousand cubic feet of gas -------- ------------------------------------------- MMboe million barrels of oil equivalent -------- ------------------------------------------- MMBtu million British thermal units -------- ------------------------------------------- MMscf/d million standard cubic feet of gas per day -------- ------------------------------------------- Mtpa million tonnes per annum -------- ------------------------------------------- PJ petajoule -------- ------------------------------------------- scf standard cubic feet of gas -------- ------------------------------------------- TJ terajoule -------- -------------------------------------------
(1) Total production volumes includes 1.5--2.5 MMboe from Beaumont New Ammonia (prior guidance included 2--3 MMboe).
(2) Gas hub indices include Japan Korea Marker (JKM), Title Transfer Facility (TTF) and National Balancing Point. It excludes Henry Hub. Presented on a 3-year average for 2026--2028. Includes binding sales and purchases agreements only, Woodside's equity share of Scarborough and Pluto LNG, Corpus Christi offtake volumes and assumes the Chevron asset swap is completed.
(3) Capital expenditure is reported on the basis of Woodside's net ownership interests for each project as at 30 September 2026. Louisiana LNG (90% Louisiana LNG LLC, 60% Louisiana LNG Infrastructure LLC and 20% Driftwood Pipeline LLC) capital expenditure adjusted for the cash contributions from Stonepeak Wallaby I Acquiror LP (Stonepeak) and Williams Louisiana LNG LLC (Williams). Scarborough (74.9% participating interest) and Pluto Train 2 (51% participating interest). Trion (60% participating interest). Excludes the final acquisition completion payment for Beaumont New Ammonia of $470 million. Completion of the asset swap with Chevron assumed to occur in Q4 2026.
(4) Percent change in total production may differ from percent change in daily production due to the number of days in each quarter.
(5) Restated additional volumes of 0.09 MMboe in Q3 2025 and 0.28 MMboe in YTD 2025 to reflect a revised MMBtu to boe conversion factor.
(6) Louisiana LNG YTD 2026 project spend includes $185 million of prepayments recognised in investing cash flow that are recoverable through partner cash calls but are not yet recognised as capital expenditure.
(7) Completion of the transaction is subject to the remaining conditions precedent. See "Woodside simplifies portfolio and unlocks long-term value" announced on 19 December 2024.
(8) The project has received funding from the Hydrogen Fuelled Transport Project Funding Process as part of the Western Australian Government's Renewable Hydrogen Strategy.
(9) Completion of the transaction is subject to the remaining conditions precedent. See "Woodside rationalises global portfolio with Calypso divestment".
(10) Feed gas volumes purchased from Pluto non-operating participants processed through the Pluto-KGP Interconnector are reported under Production (processing). Comparatives have been restated on the same basis.
(11) Includes the aggregate Woodside equity domestic gas production from all Western Australian projects.
(12) Overriding royalty interests held in the USA for several producing wells.
(13) Feed gas volumes purchased from Pluto non-operating participants processed through the Pluto-KGP Interconnector, and represents 10% of Pluto-KGP Interconnector volumes.
(14) Beaumont New Ammonia production volume is 72.4 kT in Q3 2026 and 351.3 kT in YTD 2026.
(15) Includes the aggregate Woodside equity domestic gas production from all Western Australian projects.
(16) Restated additional volumes of 0.09 MMboe in Q3 2025 and 0.28 MMboe in YTD 2025 to reflect a revised MMBtu to boe conversion factor.
(17) Overriding royalty interests held in the USA for several producing wells.
(18) Beaumont New Ammonia sales volumes are 94.2 kT in Q3 2026 and 352.5 kT YTD 2026.
(19) Purchased volumes sourced from third parties.
(20) Includes the impact of periodic adjustments related to the production sharing contract (PSC).
(21) Includes revenue from Beaumont New Ammonia and overriding royalty interests held in the USA for several producing wells.
(22) Values include revenue generated from purchased LNG and Liquids volumes, as well as the marketing margin on the sale of Woodside's produced LNG and Liquids portfolio. Marketing revenue excludes hedging impacts and cargo swaps where a Woodside produced cargo is sold and repurchased from the same counterparty to optimise the portfolio. The margin for these cargo swaps is recognised net in other income.
(23) Operating revenue excludes all hedging impacts.
(24) Excludes any additional benefit attributed to produced volumes through third-party trading activities.
(25) Sales volumes have been restated to reflect volumes sold in MMBtu at a revised boe conversion factor impacting realised price by -$0.6/Mcf for International pipeline gas in Q3 2025.
(26) Project final investment decisions result in amounts of previously capitalised exploration and evaluation expense (from current and prior years) being transferred to property plant & equipment. This table does not reflect the impact of such transfers.
(27) Other incorporates Louisiana LNG cash call payments to Williams for Driftwood Pipeline LLC, corporate spend, other investments and other capital expenditure.
(28) Louisiana LNG YTD 2026 project spend includes $185 million of prepayments recognised in investing cash flow that are recoverable through partner cash calls but are not yet recognised as capital expenditure.
(29) Exploration capitalised represents expenditure on successful and pending wells, plus permit acquisition costs during the period and is net of well costs reclassified to expense on finalisation of well results.
(30) Includes seismic and general permit activities and other exploration costs.
(31) Well depths are referenced to the rig rotary table.
(32) Woodside share reflects the net realised interest for the period.
(33) The Wheatstone asset processes gas from several offshore gas fields, including the Julimar and Brunello fields, for which Woodside has a 65% participating interest and is the operator.
(34) Includes the aggregate Woodside equity domestic gas production from all Western Australian projects.
(35) Woodside share reflects the net realised interest for the period.
(36) Operations governed by production sharing contracts.
(37) Beaumont New Ammonia production rate was 0.8 kT/d in Q3 2026.
This announcement was approved and authorised for release by Woodside's Disclosure Committee.
View source version on businesswire.com: https://www.businesswire.com/news/home/20261020593595/en/
CONTACT: INVESTORS
Vanessa Martin
M: +61 477 397 961
E: investor@woodside.com
MEDIA
Dan Pagoda
M: +61 482 675 731
E: dan.pagoda@woodside.com
REGISTERED ADDRESS
Woodside Energy Group Ltd
ACN 004 898 962
Mia Yellagonga
11 Mount Street
Perth WA 6000
Australia
T: +61 8 9348 4000
www.woodside.com
Comments