Press Release: Woodside Energy Third Quarter Report for Period Ended 30 September 2026

Dow Jones10-21

Strong performance from improved production and pricing

Performance highlights

   --  Achieved $84/boe realised LNG price during Q3 2026, an increase of 27% 
      compared to Q2 2026 reflecting price lags from Q2 2026, realised values 
      from LNG portfolio optimisation undertaken in Q2 2026 and stronger gas 
      hub market pricing. 
 
   --  Delivered quarterly operating revenue of $4,281 million, up 2% on Q2 
      2026 from strong LNG performance offset by lower average realised pricing 
      from the liquids portfolio. 
 
   --  Delivered quarterly production volumes of 46.2 MMboe (503 Mboe/d), up 
      12% from Q2 2026 reflecting higher production from Pluto LNG following 
      turnaround and maintenance activities completed in Q2 2026. 
 
   --  Achieved operational reliability of greater than 99% at Sangomar, NWS 
      Project LNG and Pluto LNG. 
 
   --  Completed NWS single train planned major turnaround campaign on 
      schedule and budget. 

Project highlights

   --  The Scarborough Energy Project was 99% complete and remains on budget 
      and on track for first LNG cargo this year. 
 
   --  The Trion Project was 71% complete at quarter end and remains on budget, 
      with floating production unit (FPU) fabrication advancing to 96% 
      completion, targeting first oil in 2028. 
 
   --  The Louisiana LNG Project remains on budget, targeting first LNG in 
      2029. It is 32% complete with Train 1 41% complete. 

Business and portfolio highlights

   --  Entered into an agreement to sell Woodside's 70% operated interest in 
      the Calypso Project to bp. 
 
   --  Completed the strategic review of Beaumont New Ammonia (BNA) and will 
      initiate a formal process to reduce Woodside's investment and achieve 
      value for shareholders. 
PERTH, Australia--(BUSINESS WIRE)--October 20, 2026-- 

Woodside Energy Group (ASX: WDS) (NYSE: WDS):

 
2026 full-year 
guidance                             Prior       Current         Comment 
---------------------  ---------  ------------  ---------  ------------------- 
                                                           Beaumont New 
                                                           Ammonia volumes 
                                                           revised to 1.5-2.5 
                                                           MMboe Narrowing of 
                                                           window for 
                                                           Scarborough first 
                                                           LNG cargo Reduced 
                                                           production at Okha 
                                                           FPSO Completion of 
                                                           start-up and 
                                                           performance testing 
                                                           of Julimar 
Total production                                           Development Phase 3 
volumes(1)               MMboe      174--185    174--181   in September 
---------------------  ---------  ------------  ---------  ------------------- 
Gas hub exposure(2)        %          30       No change 
---------------------  ---------  ------------  ---------  ------------------- 
Capital                $ million  4,000--4,500  No change 
 expenditure(3) 
---------------------  ---------  ------------  ---------  ------------------- 
Abandonment            $ million    500--800    No change 
 expenditure 
---------------------  ---------  ------------  ---------  ------------------- 
Exploration            $ million      200      No change 
 expenditure 
---------------------  ---------  ------------  ---------  ------------------- 
Production costs       $ million  1,500--1,800  No change 
---------------------  ---------  ------------  ---------  ------------------- 
Feed gas, services     $ million    500--600    No change 
 and processing 
 costs 
---------------------  ---------  ------------  ---------  ------------------- 
Property, plant and    $ million  4,200--4,700  No change 
 equipment 
 depreciation and 
 amortisation 
---------------------  ---------  ------------  ---------  ------------------- 
 

Woodside CEO Liz Westcott said the strong third quarter performance reflected the company's highly reliable operations and disciplined execution of major growth projects.

"Amid ongoing volatility in global energy markets, we have remained a reliable supplier to our customers. Increased quarterly operating revenue reflected increased production and strong realised prices.

"We delivered quarterly production of 46.2 million barrels of oil equivalent, up 12% from the previous quarter following the successful completion of the Pluto LNG turnaround in the second quarter and the NWS turnaround in the third quarter.

"We maintained outstanding reliability across our global portfolio, with reliability of 99.8% at Pluto LNG and 99.3% at the NWS Project in Australia, and 99.2% at Sangomar in Senegal.

"We recorded three process safety events during the quarter. Safety remains our highest priority and we are focused on applying the lessons learned from these incidents and strengthening our controls in this vitally important area.

"We continued executing our major growth projects to budget and schedule. The Scarborough Energy Project is now 99% complete, with gas from the Scarborough reservoir introduced into the FPU and exported into the trunkline during the quarter. We remain on track for first LNG cargo this year.

"The Trion Project is now 71% complete and targeting first oil in 2028. Fabrication of the FPU is well advanced, with integration and pre-commissioning activities underway.

"Louisiana LNG is targeting first LNG in 2029, with construction progressing across all three trains and the project 32% complete.

"We continued to optimise our portfolio through the ongoing integration of the Gippsland Basin assets and divestment of our operated interest in the Calypso Project. Following completion of the Beaumont New Ammonia strategic review, we will now initiate a formal process to reduce our investment and achieve value for our shareholders. These actions demonstrate our disciplined approach to portfolio management and capital allocation, with a clear focus on investments that deliver long-term shareholder value.

"We remain committed to supplying Australia's domestic gas market and are assessing our plans for four proposed development wells in the Bass Strait. Development will depend on technical assessments and the implications of the Federal Government's domestic gas reservation scheme."

 
Comparative performance at a glance 
 
 
                                  Q3     Q2    Change   Q3    Change   YTD     YTD   Change 
                                  2026   2026     %     2025     %     2026    2025     % 
-------------------  ----------  -----  -----  ------  -----  ------  ------  -----  ------ 
Operating revenue    $ million   4,281  4,185    2%    3,359   27%    11,727  9,949   18% 
-------------------  ----------  -----  -----  ------  -----  ------  ------  -----  ------ 
Production 
 volumes(4)          MMboe       46.2   41.3    12%    50.8    (9%)   132.7   149.9  (11%) 
    Gas              MMscf/d     1,697  1,326   28%    1,827   (7%)   1,534   1,831  (16%) 
    Liquids          Mbbl/d       202    214    (6%)    231   (13%)    212     228    (7%) 
    Ammonia          kT/d         0.8    1.8   (56%)    --     --%     1.3     --     --% 
    Total            Mboe/d       503    454    11%     552    (9%)    486     549   (11%) 
-------------------  ----------  -----  -----  ------  -----  ------  ------  -----  ------ 
Sales volumes(5)     MMboe       51.1   48.0     6%    55.1    (7%)   150.9   159.9   (6%) 
    Gas              MMscf/d     2,043  1,672   22%    2,122   (4%)   1,910   2,049   (7%) 
    Liquids          Mbbl/d       193    227   (15%)    226   (15%)    213     226    (6%) 
    Ammonia          kT/d         1.0    2.1   (52%)    --     --%     1.3     --     --% 
    Total            Mboe/d       555    528     5%     599    (7%)    553     586    (6%) 
-------------------  ----------  -----  -----  ------  -----  ------  ------  -----  ------ 
Average realised 
 price               $/boe        84     85     (1%)    60     40%      77     61     26% 
-------------------  ----------  -----  -----  ------  -----  ------  ------  -----  ------ 
Capital expenditure 
 and acquisitions    $ million    722    784    (8%)   1,323  (45%)   2,829   3,881  (27%) 
    Capital 
     expenditure(6)  $ million    722    784    (8%)   1,323  (45%)   2,359   3,881  (39%) 
    Acquisitions     $ million    --     --     --%     --     --%     470     --     --% 
 
 
Operations 
 

Pluto LNG

   --  Achieved quarterly LNG reliability of 99.8%. 
 
   --  Preparation for the subsea tie-in and commissioning of the XNA-03 
      infill well continued ahead of targeted start-up in Q4 2026. 

North West Shelf Project

   --  Achieved quarterly LNG reliability of 99.3%. 
 
   --  Completed single LNG train planned turnaround campaign in September 
      2026 on budget and schedule. 
 
   --  Hearings on three legal proceedings in the Federal Court of Australia 
      associated with the NWS Project Extension Commonwealth environmental 
      approvals were held in July 2026, with the decisions reserved. A separate 
      proceeding concerning the State environmental approval remains before the 
      Supreme Court of Western Australia, with a hearing scheduled for Q4 
      2026. 
 
   --  The NWS Project is continuing with infrastructure retirement planning 
      at Karratha Gas Plant (KGP) while maintaining the capacity to provide 
      processing services for third-party gas. Planning is underway to retire a 
      second LNG train in 2027 subject to relevant approvals. 

Wheatstone and Julimar-Brunello

   --  Progressed towards asset swap transaction completion, including the 
      satisfaction of certain conditions precedent relating to the following: 
 
          --  Completion of the Julimar Development Phase 3 project, with 
             start-up and performance testing of the final development wells 
             completed in September 2026. 
 
          --  Completion of decommissioning of three Julimar-Brunello 
             exploration wells, and wellhead severance of a further two 
             previously-abandoned exploration wells. 
 
 
 
   --  Subject to the receipt of all regulatory approvals, the asset swap 
      transaction continues to target completion in Q4 2026.7 

Bass Strait

   --  Achieved quarterly reliability of 91%. 
 
   --  Achieved completion of the five Turrum Phase 3 Project development 
      wells with first production targeting H1 2027. 
 
   --  Progressed integration of the Gippsland Basin assets into Woodside's 
      operated portfolio following transfer of operatorship from ExxonMobil on 
      1 July 2026. 

Other Australia

   --  Following remediation of a subsea mooring system defect and successful 
      FPSO reconnection, production resumed at Okha, with ongoing well 
      assessment supporting further production restoration. 
 
   --  Subsequent to the period, the Pyrenees floating production storage and 
      offloading (FPSO) disconnected ahead of scheduled shipyard activity in Q4 
      2026. 

Sangomar

   --  Achieved an average daily production rate of 94 Mbbl/d (100% basis, 73 
      Mbbl/d Woodside share) with reliability of 99.2%. 
 
   --  Production rate reflects natural field decline and reduced production 
      sharing contract (PSC) net entitlement following recovery of 100% 
      Woodside-funded pre-FID costs. 

Gulf of America

   --  Achieved quarterly reliability of 94.3% at Shenzi. 
 
   --  Executed a planned shutdown at Shenzi in July 2026 and a three-well 
      intervention campaign in August 2026. 
 
   --  Atlantis achieved start-up of the Major Facility Expansion (MFX) 
      project, bringing the first of two water injectors online. The project 
      added subsea infrastructure, wells and upgraded water injection 
      equipment. 

Beaumont New Ammonia

   --  BNA suspended operations for approximately 30 days following a Tier 1 
      process safety event. There were no injuries to personnel or damage to 
      equipment and no lasting impact to the environment. The facility was 
      safely restarted following completion of an internal investigation and 
      implementation of appropriate actions. 
 
   --  Production during the quarter was constrained to 69% of nameplate 
      capacity due to third-party feedstock availability and the 30 day shut 
      down. Third-party cargoes were sourced to satisfy customer commitments on 
      similar financial terms. 
 
   --  Commencement of lower-carbon ammonia production remains targeted for 
      2027, subject to commissioning of Linde's low-carbon hydrogen facilities 
      and start-up of ExxonMobil's carbon capture and storage (CCS) 
      infrastructure. During the quarter, the Texas Railroad Commission voted 
      to approve the permit for ExxonMobil's Rose carbon storage project, 
      moving it into the final stages of a multi-year regulatory process. 
 
   --  Completed the strategic review of BNA. In light of the evolving pace of 
      lower-carbon ammonia market development, Woodside will initiate a formal 
      process to reduce its investment in BNA investment and achieve value for 
      shareholders. 
 
Marketing 
 

Revenue and trading

   --  Strong marketing performance reflected the realisation of value from 
      LNG portfolio optimisation undertaken in Q2 2026, with revenue recognised 
      as cargoes were delivered in Q3 2026. 
 
   --  Average realised LNG prices improved quarter-on-quarter, reflecting the 
      realisation of price lags from Q2 2026 and stronger gas hub market 
      pricing in the lead up to northern hemisphere winter months. 
 
   --  Approximately 33% of LNG sold was linked to gas hub indices during the 
      quarter. 
 
   --  The impact of crude supply disruptions softened during the quarter as 
      export flows recovered and market balances improved, resulting in lower 
      market prices for crude oil and weaker realised premiums for the liquids 
      portfolio (oil, condensate and liquids traded). 

Pipeline gas

   --  Executed incremental pipeline gas sales of: 
 
          --  12.9 PJ to be delivered to the Western Australian market from 
             2027 to 2029 
 
          --  18.4 PJ to be delivered to the East Coast market from 2026 to 
             2028. 
 
 
 
   --  Progressed expression of interest for 20 PJ of Bass Strait supply and 
      finalised a number of 2027 and 2028 offers during the period. 
 
Projects 
 

Scarborough Energy Project

   --  The Scarborough and Pluto Train 2 projects remain on budget and were 
      99% complete at the end of the quarter (excluding Pluto Train 1 
      modifications). 
 
   --  The FPU and subsea production system commissioning and start-up 
      activities continued, including well clean-up and export of gas to 
      pressurise the trunkline. Well clean-up results are in line with 
      reservoir and well performance expectations. 
 
   --  Completed all mechanical runs of Pluto Train 2 compressors and, 
      subsequent to the period, Scarborough gas was introduced to the warm end 
      (gas pre-treatment) of the LNG train. Activities in the cold end continue 
      to progress, which will enable the commencement of gas liquefaction. 
 
   --  Following the Pluto Train 1 planned major maintenance campaign in Q2, 
      modifications to Pluto Train 1 which will allow processing of Scarborough 
      gas continued. The final module arrived onsite with activities focused on 
      module hook-up and integration. 
 
   --  First LNG cargo is on track for Q4 2026. 

Trion

   --  The Trion Project remains on budget and was 71% complete at the end of 
      the quarter. 
 
   --  Advanced the drilling campaign, with 10 of 24 wells drilled and the 
      first subsea tree installed. 
 
   --  Delivered subsea equipment and disconnectable turret mooring $(DTM)$ buoy 
      to Mexico and commenced offshore installation. 
 
   --  The FPU fabrication reached 96% completion, with integration and 
      pre-commissioning activities underway. 
 
   --  Progressed floating storage and offloading vessel construction, 
      including completion of DTM turret integration into the hull. 
 
   --  The project is targeting first oil in 2028. 

Louisiana LNG

   --  The Louisiana LNG Project remains on budget and was 32% complete at the 
      end of the quarter. 
 
   --  LNG terminal construction advanced across marine, site works and LNG 
      tanks, with LNG Tank 1 wall concrete reaching 50% completion. 
 
   --  Train 1 was 41% complete at the end of the quarter, with structural 
      steel and above-ground piping installation progressed. 
 
   --  Trains 2 and 3 were 27% and 22% complete respectively at the end of the 
      quarter, with above-ground piping installation commenced for Train 2 and 
      first concrete foundation poured for Train 3. 
 
   --  Structural steel supply challenges associated with ongoing disruptions 
      in the Middle East continue to be mitigated through alternative logistics 
      routes and fabrication sources. 
 
   --  Ongoing engagement with high-quality counterparties for equity 
      participation and LNG offtake continues. 
 
   --  The project is targeting first LNG in 2029. 

Hydrogen Refueller @H2Perth

   --  Ready for start-up was achieved and commissioning activities continued 
      onsite with first hydrogen production targeting Q4 2026.8 
 
Decommissioning 
 
   --  Completed the plug and abandonment (P&A) of five wells in the 
      Julimar-Brunello and NWS gas fields. 
 
   --  Commenced offshore wellhead severance across the NWS gas, NWS oil and 
      Julimar-Brunello fields, with nine wellheads removed. 
 
   --  Continued progress across the Gippsland Basin Joint Venture wells P&A 
      campaign, including conductor recovery activities at the Cobia field, 
      completion of preparatory work for the Snapper campaign and commencement 
      of the Barracouta A P&A campaign. 
 
   --  Progressed execution readiness for the offshore Echo Yodel pipeline 
      removal campaign. 
 
   --  Submitted and secured NOPSEMA acceptance of Enfield decommissioning 
      project close-out documentation. 
 
Development and exploration 
 

Browse

   --  The Browse to North West Shelf Project continues to advance technical 
      definition, regulatory approvals and commercial agreements as part of 
      pre-front end engineering design activities. 
 
   --  Continued engagement with regulators to progress environmental 
      approvals. Following submission of the revised Environmental Protection 
      and Biodiversity Conservation Act 1999 referral, the Commonwealth 
      regulator has determined that the Browse Carbon Capture and Storage (CCS) 
      Project will be assessed by Environmental Impact Statement. 
 
   --  Progressed market engagement for the design and construction of the 
      FPSO facilities and engineering studies of downstream modifications 
      required for processing Browse gas at Karratha Gas Plant. 

Sunrise

   --  The Sunrise Joint Venture reached alignment with the Governments of 
      Timor-Leste and Australia on the key principles underpinning a new 
      Greater Sunrise PSC and associated fiscal framework. 
 
   --  The terms of the existing PSCs (JPDA PSC 03-19 and JPDA PSC 03-20) were 
      extended to 31 March 2027 to facilitate implementation of the new PSC 
      arrangements. 

Calypso

   --  On 6 August 2026, Woodside entered an agreement to sell its 70% 
      operated interest in the Calypso Project to bp.9 
 
   --  All key conditions precedent have now been met, with completion of the 
      transaction targeting Q4 2026. 

Exploration

   --  The Nasim-1X well, operated by ENI, was spud on the Tiba license in 
      Egypt in August 2026 and drilling activities are ongoing. Woodside holds 
      a 40% non-operated interest. 
 
   --  Woodside was awarded one lease in the US Gulf of America where Woodside 
      was the successful bidder from the Big Beautiful Gulf 3 Lease Sale held 
      in August 2026. 
 
   --  Entered a non-binding memorandum of understanding with Petr leos 
      Mexicanos (PEMEX) to evaluate deepwater opportunities in the Gulf of 
      Mexico. 
 
Corporate activities 
 

Cost reduction

   --  Woodside continued to progress the cost reduction program during the 
      quarter, focused on improving efficiency and productivity. 
 
   --  Initiatives underway include simplifying organisational structures, 
      improving maintenance and contracting processes, and expanding the use of 
      automation and AI. 
 
   --  The program is targeting to deliver a US$350 million structurally lower 
      recurring cost base against the 2025 baseline from 2028. 

Climate and sustainability

   --  Three process safety events were recorded during the quarter. 
 
          --  A Tier 1 event at BNA (refer to the BNA section for details). 
 
          --  Two Tier 2 events involving: 
 
                 --  a marine diesel oil release during flushing operations at 
                    Okha, which had no environmental impact as the release was 
                    contained. 
 
                 --  a methane release from pipework during turnaround 
                    activities at KGP. 
 
 
 
 
 
   --  The Sam Houston Jones State Park Project, a voluntary environmental and 
      biodiversity restoration initiative located 15 miles from LALNG, has 
      progressed, with approximately 50% of site preparation completed ahead of 
      seedling planting. 

Hedging

   --  As at 30 September 2026, approximately 87% of the 30 MMboe of 2026 
      oil-linked production previously hedged (at an average price of $74.23 
      per barrel) had been cash settled. No additional oil-linked corporate 
      hedges were entered during the quarter and the 2027 hedge position of 10 
      MMboe remains unchanged. 
 
   --  Continued to utilise Henry Hub and TTF commodity swaps in connection 
      with overall management of Corpus Christi LNG volumes. 
 
   --  For 2026 year to date, hedge settlements resulted in a net cash outflow 
      of approximately $565 million, and a reduction to pre-tax profit of $519 
      million. Cash settlements on oil-linked hedges occur in advance of the 
      related profit and loss impact, resulting in temporary differences. 

Embedded commodity derivative

   --  In 2023, Woodside entered a revised long-term gas sale and purchase 
      contract with Perdaman. A component of the selling price is linked to the 
      price of urea, creating an embedded commodity derivative in the contract. 
      The fair value of the embedded derivative is estimated using a Monte 
      Carlo simulation model. 
 
   --  As there is no long-term urea forward curve, TTF continues to be used 
      as a proxy to simulate the value of the derivative over the life of the 
      contract. 
 
   --  For 2026 year to date, an unrealised pre-tax loss of approximately $179 
      million is expected to be recognised through other expense. 

Funding and liquidity

   --  During the quarter Woodside paid a fully franked dividend of $1,084 
      million and an $800 million bond maturity in September. 
 
   --  As at 30 September 2026, Woodside had liquidity of approximately $7,800 
      million and net debt (including lease liabilities) of approximately 
      $8,900 million. 

Capital Markets Day

   --  Woodside's 2026 Capital Markets Day will be held on Thursday, 5 
      November 2026, commencing at 10:00 am AEDT/7:00 am AWST/5:00 pm CST 
      (Wednesday, 4 November 2026). 
 
   --  A live webcast of the Australian event will be available on Woodside's 
      website at https://meetings.lumiconnect.com/300-191-159-742. 
 
   --  This will be followed by a US Capital Markets Day on 12 November 2026 
      in New York. 

Upcoming events 2026-2027

 
 November  5    2026 Capital Markets Day (Australia) 
---------      ----------------------------------------- 
           12   2026 Capital Markets Day (United States) 
---------      ----------------------------------------- 
 January   28   Fourth Quarter Report 
---------      ----------------------------------------- 
 February  23   2026 Annual Report 
---------      ----------------------------------------- 
 April     21   First Quarter Report 
---------      ----------------------------------------- 
 
 
Production volumes 
 
 
                                         Q3     Q2     Q3     YTD    YTD 
                                         2026   2026   2025   2026   2025 
----------------------------  --------  -----  -----  -----  -----  ----- 
   Gas                        MMscf/d   1,697  1,326  1,827  1,534  1,831 
   Liquids                    Mbbl/d      202    214    231    212    228 
   Ammonia                    kT/d        0.8    1.8     --    1.3     -- 
----------------------------  --------  -----  -----  -----  -----  ----- 
   Total production volumes   Mboe/d      503    454    552    486    549 
----------------------------  --------  -----  -----  -----  -----  ----- 
 

Production (reserves)

 
                                      Q3      Q2      Q3     YTD     YTD 
                                     2026    2026    2025    2026    2025 
-------------------------  -------  ------  ------  ------  ------  ------ 
AUSTRALIA 
LNG 
   North West Shelf        Mboe      5,646   5,491   5,895  16,815  17,665 
   Pluto(10)               Mboe     12,516   7,701  12,118  31,208  33,272 
   Wheatstone              Mboe      1,338   1,454   2,677   5,078   7,523 
-------------------------  -------  ------  ------  ------  ------  ------ 
   Total                   Mboe     19,500  14,646  20,690  53,101  58,460 
-------------------------  -------  ------  ------  ------  ------  ------ 
 
Pipeline gas 
   Bass Strait             Mboe      4,416   3,440   3,929  10,612  10,774 
   Other(10,11)            Mboe      2,862   2,510   3,830   7,880  11,450 
-------------------------  -------  ------  ------  ------  ------  ------ 
   Total                   Mboe      7,278   5,950   7,759  18,492  22,224 
-------------------------  -------  ------  ------  ------  ------  ------ 
 
Crude oil and condensate 
   North West Shelf        Mbbl      1,054     949   1,093   2,956   3,111 
   Pluto(10)               Mbbl        889     602     980   2,336   2,717 
   Wheatstone              Mbbl        239     271     471     937   1,331 
   Bass Strait             Mbbl        552     477     505   1,371   1,364 
   Macedon & Pyrenees      Mbbl        263     169     347     793   1,274 
   Ngujima-Yin             Mbbl        659     684     960   1,996   2,769 
   Okha                    Mbbl          7       -     575     318   1,474 
-------------------------  -------  ------  ------  ------  ------  ------ 
   Total                   Mboe      3,663   3,152   4,931  10,707  14,040 
-------------------------  -------  ------  ------  ------  ------  ------ 
 
NGL 
   North West Shelf        Mbbl        216     191     258     588     695 
   Pluto(10)               Mbbl         45      28      58     112     152 
   Bass Strait             Mbbl        772     761     842   2,163   2,263 
-------------------------  -------  ------  ------  ------  ------  ------ 
   Total                   Mboe      1,033     980   1,158   2,863   3,110 
-------------------------  -------  ------  ------  ------  ------  ------ 
 
Total Australia            Mboe     31,474  24,728  34,538  85,163  97,834 
-------------------------  -------  ------  ------  ------  ------  ------ 
 Mboe/d                                342     272     375     312     358 
 ---------------------------------  ------  ------  ------  ------  ------ 
 
 
                                        Q3      Q2      Q3      YTD      YTD 
                                       2026    2026    2025     2026     2025 
---------------------------  -------  ------  ------  ------  -------  ------- 
INTERNATIONAL 
Pipeline gas 
   USA                       Mboe        358     405     491    1,209    1,278 
   Trinidad & Tobago         Mboe          -       -     242        -    4,863 
   Other(12)                 Mboe          -       -       6        9       34 
---------------------------  -------  ------  ------  ------  -------  ------- 
   Total                     Mboe        358     405     739    1,218    6,175 
---------------------------  -------  ------  ------  ------  -------  ------- 
 
Crude oil and condensate 
   Atlantis                  Mbbl      2,424   2,526   2,783    7,671    7,859 
   Mad Dog                   Mbbl      2,710   2,704   2,310    8,172    7,357 
   Shenzi                    Mbbl      1,667   1,859   2,088    5,422    6,431 
   Trinidad & Tobago         Mbbl          -       -      13        -      205 
   Sangomar                  Mbbl      6,758   7,854   7,516   21,764   21,922 
   Other(12)                 Mbbl         35      35       5      124        5 
---------------------------  -------  ------  ------  ------  -------  ------- 
   Total                     Mboe     13,594  14,978  14,715   43,153   43,779 
---------------------------  -------  ------  ------  ------  -------  ------- 
 
NGL 
   USA                       Mbbl        276     370     442    1,159    1,238 
   Other(12)                 Mbbl          -       -       3        5       18 
---------------------------  -------  ------  ------  ------  -------  ------- 
   Total                     Mboe        276     370     445    1,164    1,256 
---------------------------  -------  ------  ------  ------  -------  ------- 
 
Total International          Mboe     14,228  15,753  15,899   45,535   51,210 
---------------------------  -------  ------  ------  ------  -------  ------- 
 Mboe/d                                  155     173     173      167      188 
 -----------------------------------  ------  ------  ------  -------  ------- 
 
Total production (reserves) 
 volumes                     Mboe     45,702  40,481  50,437  130,698  149,044 
---------------------------  -------  ------  ------  ------  -------  ------- 
 Mboe/d                                  497     445     548      479      546 
 -----------------------------------  ------  ------  ------  -------  ------- 
 

Production (processing)

 
                                        Q3      Q2      Q3      YTD      YTD 
                                       2026    2026    2025     2026     2025 
---------------------------  -------  ------  ------  ------  -------  ------- 
AUSTRALIA 
Pluto-KGP 
Interconnector(13) 
   LNG                       Mboe        254     171     210      667      583 
   Pipeline gas              Mboe          -       -      91        -      253 
   Crude oil and condensate  Mbbl          8       6       9       23       28 
   NGL                       Mbbl          5       3       7       12       17 
---------------------------  -------  ------  ------  ------  -------  ------- 
Total Australia              Mboe        267     180     317      702      881 
---------------------------  -------  ------  ------  ------  -------  ------- 
 Mboe/d                                    3       2       3        3        3 
 -----------------------------------  ------  ------  ------  -------  ------- 
 
INTERNATIONAL 
   Beaumont New Ammonia(14)  Mboe        266     609       -    1,292        - 
---------------------------  -------  ------  ------  ------  -------  ------- 
Total International          Mboe        266     609       -    1,292        - 
---------------------------  -------  ------  ------  ------  -------  ------- 
 Mboe/d                                    3       7       -        5        - 
 -----------------------------------  ------  ------  ------  -------  ------- 
 
Total production 
 (processing) volumes        Mboe        533     789     317    1,994      881 
---------------------------  -------  ------  ------  ------  -------  ------- 
 Mboe/d                                    6       9       3        7        3 
 -----------------------------------  ------  ------  ------  -------  ------- 
 
Total production volumes     Mboe     46,235  41,270  50,754  132,692  149,925 
---------------------------  -------  ------  ------  ------  -------  ------- 
 Mboe/d                                  503     454     552      486      549 
 -----------------------------------  ------  ------  ------  -------  ------- 
 
 
Sales volumes 
 
 
                                    Q3     Q2     Q3     YTD    YTD 
                                    2026   2026   2025   2026   2025 
-----------------------  --------  -----  -----  -----  -----  ----- 
   Gas                   MMscf/d   2,043  1,672  2,122  1,910  2,049 
   Liquids               Mbbl/d      193    227    226    213    226 
   Ammonia               kT/d        1.0    2.1     --    1.3     -- 
-----------------------  --------  -----  -----  -----  -----  ----- 
   Total sales volumes   Mboe/d      555    528    599    553    586 
-----------------------  --------  -----  -----  -----  -----  ----- 
 
 
                                      Q3      Q2      Q3     YTD     YTD 
                                     2026    2026    2025    2026    2025 
-------------------------  -------  ------  ------  ------  ------  ------ 
AUSTRALIA 
LNG 
   North West Shelf        Mboe      5,630   3,922   4,743  17,016  16,689 
   Pluto                   Mboe     13,146   9,011  13,609  34,062  35,254 
   Wheatstone              Mboe      1,967   1,995   1,623   6,578   7,186 
-------------------------  -------  ------  ------  ------  ------  ------ 
   Total                   Mboe     20,743  14,928  19,975  57,656  59,129 
-------------------------  -------  ------  ------  ------  ------  ------ 
 
Pipeline gas 
   Bass Strait             Mboe      4,277   3,736   4,070  10,579  10,989 
   Other(15)               Mboe      3,152   2,756   4,028   8,406  11,445 
-------------------------  -------  ------  ------  ------  ------  ------ 
   Total                   Mboe      7,429   6,492   8,098  18,985  22,434 
-------------------------  -------  ------  ------  ------  ------  ------ 
 
Crude oil and condensate 
   North West Shelf        Mbbl        651   1,300   1,194   2,633   3,039 
   Pluto                   Mbbl        775   1,011   1,338   2,978   2,693 
   Wheatstone              Mbbl         92     427     417     787   1,402 
   Bass Strait             Mbbl        593     619     531   1,740   1,664 
   Ngujima-Yin             Mbbl        690     963   1,171   2,322   2,985 
   Okha                    Mbbl          -       -       -     251   1,256 
   Macedon & Pyrenees      Mbbl          -     511     496     512   1,493 
-------------------------  -------  ------  ------  ------  ------  ------ 
   Total                   Mboe      2,801   4,831   5,147  11,223  14,532 
-------------------------  -------  ------  ------  ------  ------  ------ 
 
NGL 
   North West Shelf        Mbbl          -     473     430     473     907 
   Pluto                   Mbbl          -      93     105      93     215 
   Bass Strait             Mbbl        874     437     374   2,177   1,610 
-------------------------  -------  ------  ------  ------  ------  ------ 
   Total                   Mboe        874   1,003     909   2,743   2,732 
-------------------------  -------  ------  ------  ------  ------  ------ 
 
Total Australia            Mboe     31,847  27,254  34,129  90,607  98,827 
-------------------------  -------  ------  ------  ------  ------  ------ 
 Mboe/d                                346     299     371     332     362 
 ---------------------------------  ------  ------  ------  ------  ------ 
 
 
                                        Q3      Q2      Q3      YTD      YTD 
                                       2026    2026    2025     2026     2025 
---------------------------  -------  ------  ------  ------  -------  ------- 
INTERNATIONAL 
Pipeline gas 
   USA(16)                   Mboe        361     413     438    1,160    1,246 
   Trinidad & Tobago         Mboe          -       -     243        -    4,750 
   Other(17)                 Mboe         45       3       4       51       12 
---------------------------  -------  ------  ------  ------  -------  ------- 
   Total                     Mboe        406     416     685    1,211    6,008 
---------------------------  -------  ------  ------  ------  -------  ------- 
 
Crude oil and condensate 
   Atlantis                  Mbbl      2,400   2,544   2,801    7,672    7,901 
   Mad Dog                   Mbbl      2,605   2,780   2,310    8,118    7,415 
   Shenzi                    Mbbl      1,415   1,870   2,094    5,179    6,326 
   Trinidad & Tobago         Mbbl          -       -       5        -      181 
   Sangomar                  Mbbl      6,932   6,865   6,833   20,619   20,859 
   Other(17)                 Mbbl        130      67      47      286      151 
---------------------------  -------  ------  ------  ------  -------  ------- 
   Total                     Mboe     13,482  14,126  14,090   41,874   42,833 
---------------------------  -------  ------  ------  ------  -------  ------- 
 
NGL 
   USA                       Mbbl        254     389     440    1,165    1,196 
   Other(17)                 Mbbl         29       1       2       32        6 
---------------------------  -------  ------  ------  ------  -------  ------- 
   Total                     Mboe        283     390     442    1,197    1,202 
---------------------------  -------  ------  ------  ------  -------  ------- 
 
Ammonia 
   Beaumont New Ammonia(18)  Mboe        346     702       -    1,297        - 
---------------------------  -------  ------  ------  ------  -------  ------- 
   Total                     Mboe        346     702       -    1,297        - 
---------------------------  -------  ------  ------  ------  -------  ------- 
 
Total International          Mboe     14,517  15,634  15,217   45,579   50,043 
---------------------------  -------  ------  ------  ------  -------  ------- 
 Mboe/d                                  158     172     165      167      183 
 -----------------------------------  ------  ------  ------  -------  ------- 
 
MARKETING(19) 
   LNG                       Mboe      4,389   4,856   5,492   13,645   10,579 
   Liquids                   Mboe        341     298     249    1,023      417 
---------------------------  -------  ------  ------  ------  -------  ------- 
   Total                     Mboe      4,730   5,154   5,741   14,668   10,996 
---------------------------  -------  ------  ------  ------  -------  ------- 
 
Total Marketing              Mboe      4,730   5,154   5,741   14,668   10,996 
---------------------------  -------  ------  ------  ------  -------  ------- 
 
Total sales volumes          Mboe     51,094  48,042  55,087  150,854  159,866 
---------------------------  -------  ------  ------  ------  -------  ------- 
 Mboe/d                                  555     528     599      553      586 
 -----------------------------------  ------  ------  ------  -------  ------- 
 
 
Operating revenue (US$ million) 
 
 
                                   Q3     Q2     Q3     YTD     YTD 
                                   2026   2026   2025   2026    2025 
--------------------------------  -----  -----  -----  ------  ----- 
AUSTRALIA 
  North West Shelf                  479    378    323   1,305  1,153 
  Pluto                           1,121    795  1,000   2,682  2,539 
  Wheatstone                        189    167    135     536    589 
  Bass Strait                       380    352    265     964    776 
  Macedon                            56     57     44     169    148 
  Ngujima-Yin                        73    102     88     223    231 
  Okha                                -      2      -      27     90 
  Pyrenees                            -     45     37      45    120 
--------------------------------  -----  -----  -----  ------  ----- 
Revenue from sale of products     2,298  1,898  1,892   5,951  5,646 
Intersegment revenue               (53)   (51)   (67)   (154)   (76) 
Processing and services revenue      34     35     39     122    148 
--------------------------------  -----  -----  -----  ------  ----- 
Total Australia                   2,279  1,882  1,864   5,919  5,718 
--------------------------------  -----  -----  -----  ------  ----- 
 
INTERNATIONAL 
  Atlantis                          215    258    196     672    568 
  Mad Dog                           227    272    150     689    501 
  Shenzi                            120    192    142     450    447 
  Trinidad & Tobago(20)               -      -      6       -    150 
  Sangomar                          659    763    477   1,946  1,468 
  Other(21)                          44    145      2     231      9 
--------------------------------  -----  -----  -----  ------  ----- 
Revenue from sale of products     1,265  1,630    973   3,988  3,143 
--------------------------------  -----  -----  -----  ------  ----- 
Total International               1,265  1,630    973   3,988  3,143 
--------------------------------  -----  -----  -----  ------  ----- 
 
MARKETING 
Revenue from sale of products       672    620    452   1,652    996 
Intersegment revenue                 53     51     67     154     76 
Shipping and other revenue           12      2      3      14     16 
--------------------------------  -----  -----  -----  ------  ----- 
Total Marketing(22)                 737    673    522   1,820  1,088 
--------------------------------  -----  -----  -----  ------  ----- 
 
Operating revenue(23)             4,281  4,185  3,359  11,727  9,949 
--------------------------------  -----  -----  -----  ------  ----- 
 
 
Realised prices 
 
 
                                 Q3    Q2     Q3            Q3     Q2     Q3 
                       Units    2026   2026   2025  Units   2026   2026   2025 
--------------------  --------  ----  -----  -----  -----  -----  -----  ----- 
LNG produced          $/MMBtu   13.3   10.5    9.5  $/boe     84     66     60 
LNG traded(24)        $/MMBtu   16.6   15.2   11.2  $/boe    108     99     71 
Pipeline gas: 
  Western Australia    A$/GJ     6.9    6.9    6.8 
  East Coast 
   Australia           A$/GJ    15.3   15.7   12.9 
  International(25)    $/Mcf     2.6    3.0    3.6 
Pipeline gas                                        $/boe     49     50     38 
Oil and condensate     $/bbl      93    107     68  $/boe     93    107     68 
NGL                    $/bbl      52     57     41  $/boe     52     57     41 
Liquids traded(24)     $/bbl      71    110     60  $/boe     71    110     60 
Average realised 
 price                 $/boe      84     85     60 
Dated Brent            $/bbl      97    105     69 
JCC (lagged three 
 months)               $/bbl     111     67     75 
WTI                    $/bbl      86     93     65 
JKM                   $/MMBtu   18.9   17.5   12.5 
TTF                   $/MMBtu   18.0   16.4   11.7 
 
 
Capital expenditure (US$ million) 
 
 
                                         Q3      Q2     Q3      YTD      YTD 
                                         2026    2026   2025    2026     2025 
-------------------------------------  -------  -----  -----  -------  ------- 
Evaluation capitalised(26)                  12     15      8       36       37 
Property plant & equipment               1,738  1,557  1,530    4,981    5,902 
Cash contributions from participants   (1,029)  (878)  (222)  (2,754)  (2,092) 
Other(27)                                    1     90      7       96       34 
-------------------------------------  -------  -----  -----  -------  ------- 
Capital expenditure                        722    784  1,323    2,359    3,881 
-------------------------------------  -------  -----  -----  -------  ------- 
Acquisitions                                 -      -      -      470        - 
-------------------------------------  -------  -----  -----  -------  ------- 
Total capital expenditure and 
 acquisitions                              722    784  1,323    2,829    3,881 
-------------------------------------  -------  -----  -----  -------  ------- 
 
 
                                         Q3      Q2     Q3      YTD      YTD 
                                         2026    2026   2025    2026     2025 
-------------------------------------  -------  -----  -----  -------  ------- 
Scarborough                                186    290    361      751    1,016 
Trion                                      267    275    291      713      698 
  Louisiana LNG capital expenditure        967    723    498    2,562    3,153 
  Cash contributions from 
   participants                        (1,029)  (878)  (222)  (2,754)  (2,092) 
  Louisiana LNG other(27)                    7     26      -       38        - 
Louisiana LNG(28)                         (55)  (129)    276    (154)    1,061 
Other                                      324    348    395    1,049    1,106 
-------------------------------------  -------  -----  -----  -------  ------- 
Capital expenditure                        722    784  1,323    2,359    3,881 
-------------------------------------  -------  -----  -----  -------  ------- 
 
 
Other expenditure (US$ million) 
 
 
                                           Q3     Q2     Q3     YTD    YTD 
Exploration and evaluation expenditure     2026   2026   2025   2026   2025 
----------------------------------------  -----  -----  -----  -----  ----- 
Exploration capitalised(26,29)                3      2     17     45     22 
Exploration and evaluation expensed(30)      63     50     46    163    127 
Permit amortisation                           2      2      2      6      5 
----------------------------------------  -----  -----  -----  -----  ----- 
Total                                        68     54     65    214    154 
----------------------------------------  -----  -----  -----  -----  ----- 
 
                                           Q3     Q2     Q3     YTD    YTD 
Trading costs                              2026   2026   2025   2026   2025 
----------------------------------------  -----  -----  -----  -----  ----- 
Australia                                    83     52     71    184    159 
International                                14      -      -     14      - 
Marketing                                   407    533    374  1,278    696 
----------------------------------------  -----  -----  -----  -----  ----- 
Total                                       504    585    445  1,476    855 
----------------------------------------  -----  -----  -----  -----  ----- 
 
                                           Q3     Q2     Q3     YTD    YTD 
Abandonment expenditure                    2026   2026   2025   2026   2025 
----------------------------------------  -----  -----  -----  -----  ----- 
Total                                       172    139    141    427    658 
----------------------------------------  -----  -----  -----  -----  ----- 
 
 
Exploration or appraisal wells drilled 
 
 
                                                                         Actual 
                                                                  Water   well 
         Permit                                           Spud    depth   depth 
Region     area     Well     Target     Interest (%)      date     (m)   (m)(31)   Remarks 
-------  -------  ---------  -------  -----------------  -------  -----  -------  --------- 
                                                           25 
                                                          August                  Drilling, 
Egypt     Tiba    Nasim-1X     Gas    40% Non-operator     2026    -1     2,650    onshore 
-------  -------  ---------  -------  -----------------  -------  -----  -------  --------- 
 
 
Permits and licences 
 

Key changes to permit and licence holdings during the quarter ended 30 September 2026 are noted below.

 
                Permits or licence    Change in       Current 
Region          areas                interest (%)   interest (%)    Remarks 
--------------  ------------------  -------------  -------------  ------------ 
United States   AC 125, AC 126          (45%)           --%         Assigned 
                ------------------  -------------  -------------  ------------ 
                GB 721, GC 598, AC 
                36, AC 80, AC 81       (100%)           --%       Relinquished 
 EB 682                                 100%           100%         Awarded 
 
 
Production rates 
 

Average daily production rates (100% project) for the quarter ended 30 September 2026:

 
                      Woodside           Production rate 
                     share(32)        (100% project, Mboe/d)       Remarks 
                                        Q3            Q2 
                                        2026          2026 
----------------  ----------------  ------------  -----------  --------------- 
AUSTRALIA 
NWS Project 
                                                               Increased 
                                                               production 
                                                               driven by 
                                                               reliability and 
                                                               wells returned 
LNG                    29.17%           210           203      to service. 
Crude oil and 
 condensate            29.26%            39           35 
NGL                    29.36%            8             7 
 
Pluto LNG 
                                                               Production 
                                                               higher 
                                                               following 
                                                               planned 
                                                               maintenance 
                                                               turnaround in 
LNG                    90.00%           124           75       Q2. 
Crude oil and 
 condensate            90.00%            10            7 
 
Pluto-KGP 
Interconnector 
                                                               Production 
                                                               higher due to 
                                                               major 
                                                               turnaround in 
                                                               Q2 which 
                                                               impacted feed 
LNG                   100.00%            28           19       gas. 
Crude oil and 
 condensate           100.00%            1             1 
NGL                   100.00%            1            -- 
 
Wheatstone(33) 
                                                               Julimar 
                                                               Brunello 
                                                               production 
                                                               lower due to 
                                                               impact of 
                                                               offshore 
                                                               project 
LNG                    6.00%            243           204      activities. 
Crude oil and 
 condensate            8.12%             32           28 
 
Bass Strait 
                                                               Production 
                                                               higher due to 
                                                               seasonal 
                                                               increases in 
Pipeline gas           48.95%            98           83       demand. 
Crude oil and 
 condensate            43.61%            14           12 
NGL                    44.96%            19           18 
 
Australia Oil 
                                                               Okha 
                                                               reconnected 
Ngujima-Yin            60.00%            12           13       late in Q3. 
Okha                   50.00%            --           -- 
Pyrenees               71.43%            4             3 
 
Other 
Pipeline gas(34)                         31           28 
 
 
 
                      Woodside           Production rate 
                     share(35)        (100% project, Mboe/d)       Remarks 
                                         Q3           Q2 
                                        2026          2026 
----------------  ----------------  ------------  -----------  --------------- 
INTERNATIONAL 
Atlantis 
                                                               Production 
                                                               lower due to 
                                                               higher planned 
Crude oil and                                                  and unplanned 
condensate             38.50%            68           72       events. 
NGL                    38.50%            3             5 
Pipeline gas           38.50%            7             8 
 
Mad Dog 
Crude oil and 
 condensate            20.86%           141           142 
NGL                    20.86%            5             5 
Pipeline gas           20.86%            4             3 
 
Shenzi 
                                                               Production 
                                                               lower because 
                                                               of planned 
                                                               shutdown and 
Crude oil and                                                  well 
condensate             64.55%            28           32       interventions. 
NGL                    64.65%            1             2 
Pipeline gas           64.64%            1             1 
 
Sangomar 
                                                               Production 
                                                               lower due to 
                                                               natural field 
Crude oil            78.01%(36)          94           99       decline. 
 
Beaumont New 
Ammonia 
                                                               Production 
                                                               lower due to 
                                                               unplanned 
Ammonia(37)           100.00%            3             7       event. 
 
 
 
Disclaimer and important notice 
 

Forward looking statements

This report contains forward-looking statements. These statements may relate to Woodside's business, goals, targets, aspirations, plans, expectations, market conditions, results of operations and financial condition, including but not limited to, statements regarding the timing, completion and outcomes of transactions, construction costs and capital expenditures, supply and demand for Woodside's products, development, completion and execution of Woodside's projects, the expected benefits, cash flows and rates of return or other future results of investments, strategies and transactions, the payment of future dividends and the amount thereof, future results of projects, operating activities and new energy products, expectations and plans for renewables production capacity and investments in, and development of, renewables projects, expectations and guidance with respect to production, production costs and other costs, capital expenditure, abandonment expenditure, exploration expenditure and gas hub exposure, trends in commodity prices and currency exchange rates, adoption and implementation of new technologies and expectations regarding the achievement of Woodside's Scope 1 and 2 greenhouse gas emissions target (in each case on a net equity or gross equity basis as specified) and other climate and sustainability goals. All statements, other than statements of historical or present facts, are forward-looking statements and generally may be identified by the use of forward-looking words such as "aim", "anticipate", "aspire", "believe", "enable", "estimate", "expect", "forecast", "foresee", "guidance", "intend", "likely", "may", "objective", "outlook", "pathway", "plan", "position", "potential", "project", "schedule", "seek", "should", "strategy", "strive", "target", "will" and other similar words or expressions.

Forward-looking statements in this report are not guarantees of future events or performance, but are in the nature of future expectations that are based on management's current expectations and assumptions. Those statements and any assumptions on which they are based are subject to change without notice and are subject to inherent known and unknown risks, uncertainties, contingencies and other factors, many of which are beyond the control of Woodside, its related bodies corporate and their respective officers, directors, employees, advisers or representatives. Important factors that could cause actual results to differ materially from those in the forward-looking statements and the assumptions on which they are based include, but are not limited to, fluctuations in commodity prices, actual demand for Woodside products, currency fluctuations, geotechnical factors, drilling and production results, gas commercialisation, development progress, operating results, engineering estimates, reserve and resource estimates, loss of market, industry competition, pace of technology developments, sustainability and environmental risks, climate related transition and physical risks, safety and personnel risks, changes in accounting standards, economic and financial markets conditions in various countries and regions, the actions of third parties, project delay or advancement, regulatory approvals, political risks and the impact of armed conflict and political instability (such as the ongoing conflicts in Ukraine and in the Middle East) on economic activity and oil and gas supply and demand, cost estimates, legislative, fiscal and regulatory developments, including those related to the imposition of tariffs and other trade restrictions, and the effect of future regulatory or legislative actions on Woodside or the industries in which it operates, including potential changes to tax laws, the impact of general economic conditions, inflationary conditions, prevailing exchange rates and interest rates and conditions in financial markets and risks associated with acquisitions, mergers, divestitures, and joint ventures, including difficulties integrating or separating businesses, uncertainty associated with financial projections, restructuring, increased costs and adverse tax consequences, and uncertainties and liabilities associated with acquired and divested properties and businesses.

A more detailed summary of the key risks relating to Woodside and its business can be found in the "Risk factors" section of Woodside's most recent Annual Report released to the Australian Securities Exchange and in Woodside's most recent Annual Report on Form 20-F filed with the United States Securities and Exchange Commission and available on the Woodside website at https://www.woodside.com/investors/reports-investor-briefings. You should review and have regard to these risks when considering the information contained in this report.

If any of the assumptions on which a forward-looking statement is based were to change or be found to be incorrect, this would likely cause outcomes to differ from the statements made in this report.

Investors are strongly cautioned that forward-looking statements are subject to significant uncertainties and may not prove to be correct. Actual results or performance may vary materially from those expressed in, or implied by, any forward-looking statements. None of Woodside nor any of its related bodies corporate, nor any of their respective officers, directors, employees, advisers or representatives, nor any person named in this report or involved in the preparation of the information in this report, makes any representation, assurance, guarantee or warranty (either express or implied) as to the accuracy or likelihood of fulfilment of any forward-looking statement, or any outcomes, events or results expressed or implied in any forward-looking statement in this report. All forward-looking statements contained in this report reflect Woodside's views held as at the date of this report and, except as required by applicable law, neither Woodside, its related bodies corporate, nor any of their respective officers, directors, employees, advisers or representatives nor any person named in this report or involved in the preparation of the information in this report intends to, undertakes to, or assumes any obligation to, provide any additional information or update or revise any of these statements after the date of this report, either to make them conform to actual results or as a result of new information, future events or results, changes in Woodside's expectations or otherwise. Past performance (including historical financial and operational information) is given for illustrative purposes only. It is not necessarily a reliable indicator of future performance, including future security prices.

Other important information

Unless otherwise stated, all:

   --  figures are Woodside share for the quarter ending 30 September 2026; 
 
   --  references to dollars, cents or $ in this report are to US currency; 
      and 
 
   --  references to 'Woodside', 'the company', 'the Group', 'we', 'us' and 
      'our' refer to Woodside Energy Group Ltd and its controlled entities as a 
      whole. 
 
Glossary, units of measure and conversion factors 
 

Refer to the Glossary in the Half-Year Report 2026 for definitions, including carbon related definitions.

 
 Product               Unit             Conversion factor 
--------------------  ---------------  ------------------ 
 Natural gas           5,700 scf        1 boe 
--------------------  ---------------  ------------------ 
 Condensate            1 bbl            1 boe 
--------------------  ---------------  ------------------ 
 Oil                   1 bbl            1 boe 
--------------------  ---------------  ------------------ 
 Natural gas liquids   1 bbl            1 boe 
--------------------  ---------------  ------------------ 
 Ammonia               1 metric tonne   3.68 boe 
--------------------  ---------------  ------------------ 
 
 
 Facility              Unit      LNG Conversion factor 
--------------------  --------  ---------------------- 
 Karratha Gas Plant    1 tonne   8.08 boe 
--------------------  --------  ---------------------- 
 Pluto LNG Gas Plant   1 tonne   8.34 boe 
--------------------  --------  ---------------------- 
 Wheatstone            1 tonne   8.27 boe 
--------------------  --------  ---------------------- 
 

The LNG conversion factor from tonne to boe is specific to volumes produced at each facility and is based on gas composition which may change over time.

 
 Term      Definition 
--------  ------------------------------------------- 
 bbl       barrel 
--------  ------------------------------------------- 
 bcf       billion cubic feet of gas 
--------  ------------------------------------------- 
 boe       barrel of oil equivalent 
--------  ------------------------------------------- 
 GJ        gigajoule 
--------  ------------------------------------------- 
 kT        thousand metric tonnes 
--------  ------------------------------------------- 
 kT/d      thousand metric tonnes per day 
--------  ------------------------------------------- 
 NGL       natural gas liquid 
--------  ------------------------------------------- 
 Mbbl      thousand barrels 
--------  ------------------------------------------- 
 Mbbl/d    thousand barrels per day 
--------  ------------------------------------------- 
 Mboe      thousand barrels of oil equivalent 
--------  ------------------------------------------- 
 Mboe/d    thousand barrels of oil equivalent per day 
--------  ------------------------------------------- 
 Mcf       thousand cubic feet of gas 
--------  ------------------------------------------- 
 MMboe     million barrels of oil equivalent 
--------  ------------------------------------------- 
 MMBtu     million British thermal units 
--------  ------------------------------------------- 
 MMscf/d   million standard cubic feet of gas per day 
--------  ------------------------------------------- 
 Mtpa      million tonnes per annum 
--------  ------------------------------------------- 
 PJ        petajoule 
--------  ------------------------------------------- 
 scf       standard cubic feet of gas 
--------  ------------------------------------------- 
 TJ        terajoule 
--------  ------------------------------------------- 
 

(1) Total production volumes includes 1.5--2.5 MMboe from Beaumont New Ammonia (prior guidance included 2--3 MMboe).

(2) Gas hub indices include Japan Korea Marker (JKM), Title Transfer Facility (TTF) and National Balancing Point. It excludes Henry Hub. Presented on a 3-year average for 2026--2028. Includes binding sales and purchases agreements only, Woodside's equity share of Scarborough and Pluto LNG, Corpus Christi offtake volumes and assumes the Chevron asset swap is completed.

(3) Capital expenditure is reported on the basis of Woodside's net ownership interests for each project as at 30 September 2026. Louisiana LNG (90% Louisiana LNG LLC, 60% Louisiana LNG Infrastructure LLC and 20% Driftwood Pipeline LLC) capital expenditure adjusted for the cash contributions from Stonepeak Wallaby I Acquiror LP (Stonepeak) and Williams Louisiana LNG LLC (Williams). Scarborough (74.9% participating interest) and Pluto Train 2 (51% participating interest). Trion (60% participating interest). Excludes the final acquisition completion payment for Beaumont New Ammonia of $470 million. Completion of the asset swap with Chevron assumed to occur in Q4 2026.

(4) Percent change in total production may differ from percent change in daily production due to the number of days in each quarter.

(5) Restated additional volumes of 0.09 MMboe in Q3 2025 and 0.28 MMboe in YTD 2025 to reflect a revised MMBtu to boe conversion factor.

(6) Louisiana LNG YTD 2026 project spend includes $185 million of prepayments recognised in investing cash flow that are recoverable through partner cash calls but are not yet recognised as capital expenditure.

(7) Completion of the transaction is subject to the remaining conditions precedent. See "Woodside simplifies portfolio and unlocks long-term value" announced on 19 December 2024.

(8) The project has received funding from the Hydrogen Fuelled Transport Project Funding Process as part of the Western Australian Government's Renewable Hydrogen Strategy.

(9) Completion of the transaction is subject to the remaining conditions precedent. See "Woodside rationalises global portfolio with Calypso divestment".

(10) Feed gas volumes purchased from Pluto non-operating participants processed through the Pluto-KGP Interconnector are reported under Production (processing). Comparatives have been restated on the same basis.

(11) Includes the aggregate Woodside equity domestic gas production from all Western Australian projects.

(12) Overriding royalty interests held in the USA for several producing wells.

(13) Feed gas volumes purchased from Pluto non-operating participants processed through the Pluto-KGP Interconnector, and represents 10% of Pluto-KGP Interconnector volumes.

(14) Beaumont New Ammonia production volume is 72.4 kT in Q3 2026 and 351.3 kT in YTD 2026.

(15) Includes the aggregate Woodside equity domestic gas production from all Western Australian projects.

(16) Restated additional volumes of 0.09 MMboe in Q3 2025 and 0.28 MMboe in YTD 2025 to reflect a revised MMBtu to boe conversion factor.

(17) Overriding royalty interests held in the USA for several producing wells.

(18) Beaumont New Ammonia sales volumes are 94.2 kT in Q3 2026 and 352.5 kT YTD 2026.

(19) Purchased volumes sourced from third parties.

(20) Includes the impact of periodic adjustments related to the production sharing contract (PSC).

(21) Includes revenue from Beaumont New Ammonia and overriding royalty interests held in the USA for several producing wells.

(22) Values include revenue generated from purchased LNG and Liquids volumes, as well as the marketing margin on the sale of Woodside's produced LNG and Liquids portfolio. Marketing revenue excludes hedging impacts and cargo swaps where a Woodside produced cargo is sold and repurchased from the same counterparty to optimise the portfolio. The margin for these cargo swaps is recognised net in other income.

(23) Operating revenue excludes all hedging impacts.

(24) Excludes any additional benefit attributed to produced volumes through third-party trading activities.

(25) Sales volumes have been restated to reflect volumes sold in MMBtu at a revised boe conversion factor impacting realised price by -$0.6/Mcf for International pipeline gas in Q3 2025.

(26) Project final investment decisions result in amounts of previously capitalised exploration and evaluation expense (from current and prior years) being transferred to property plant & equipment. This table does not reflect the impact of such transfers.

(27) Other incorporates Louisiana LNG cash call payments to Williams for Driftwood Pipeline LLC, corporate spend, other investments and other capital expenditure.

(28) Louisiana LNG YTD 2026 project spend includes $185 million of prepayments recognised in investing cash flow that are recoverable through partner cash calls but are not yet recognised as capital expenditure.

(29) Exploration capitalised represents expenditure on successful and pending wells, plus permit acquisition costs during the period and is net of well costs reclassified to expense on finalisation of well results.

(30) Includes seismic and general permit activities and other exploration costs.

(31) Well depths are referenced to the rig rotary table.

(32) Woodside share reflects the net realised interest for the period.

(33) The Wheatstone asset processes gas from several offshore gas fields, including the Julimar and Brunello fields, for which Woodside has a 65% participating interest and is the operator.

(34) Includes the aggregate Woodside equity domestic gas production from all Western Australian projects.

(35) Woodside share reflects the net realised interest for the period.

(36) Operations governed by production sharing contracts.

(37) Beaumont New Ammonia production rate was 0.8 kT/d in Q3 2026.

This announcement was approved and authorised for release by Woodside's Disclosure Committee.

View source version on businesswire.com: https://www.businesswire.com/news/home/20261020593595/en/

 
    CONTACT:    INVESTORS 

Vanessa Martin

M: +61 477 397 961

E: investor@woodside.com

MEDIA

Dan Pagoda

M: +61 482 675 731

E: dan.pagoda@woodside.com

REGISTERED ADDRESS

Woodside Energy Group Ltd

ACN 004 898 962

Mia Yellagonga

11 Mount Street

Perth WA 6000

Australia

T: +61 8 9348 4000

www.woodside.com

 
 

At the request of the copyright holder, you need to log in to view this content

Disclaimer: Investing carries risk. This is not financial advice. The above content should not be regarded as an offer, recommendation, or solicitation on acquiring or disposing of any financial products, any associated discussions, comments, or posts by author or other users should not be considered as such either. It is solely for general information purpose only, which does not consider your own investment objectives, financial situations or needs. TTM assumes no responsibility or warranty for the accuracy and completeness of the information, investors should do their own research and may seek professional advice before investing.