+Follow
akr
No personal profile
2
Follow
0
Followers
0
Topic
0
Badge
Posts
Hot
akr
2021-02-05
Good
Biden administration to restart permitting for major U.S. offshore wind project
akr
2021-02-05
It is good way to generate electricity. Very much established and in use..
Biden administration to restart permitting for major U.S. offshore wind project
Go to Tiger App to see more news
{"i18n":{"language":"en_US"},"userPageInfo":{"id":"3574907168485306","uuid":"3574907168485306","gmtCreate":1611813144999,"gmtModify":1612307519978,"name":"akr","pinyin":"akr","introduction":"","introductionEn":null,"signature":"","avatar":"https://static.tigerbbs.com/0be8f2d727ce962e2616ec5896a519a1","hat":null,"hatId":null,"hatName":null,"vip":1,"status":2,"fanSize":0,"headSize":2,"tweetSize":2,"questionSize":0,"limitLevel":999,"accountStatus":4,"level":{"id":0,"name":"","nameTw":"","represent":"","factor":"","iconColor":"","bgColor":""},"themeCounts":0,"badgeCounts":0,"badges":[],"moderator":false,"superModerator":false,"manageSymbols":null,"badgeLevel":null,"boolIsFan":false,"boolIsHead":false,"favoriteSize":0,"symbols":null,"coverImage":null,"realNameVerified":"success","userBadges":[{"badgeId":"1026c425416b44e0aac28c11a0848493-2","templateUuid":"1026c425416b44e0aac28c11a0848493","name":"Senior Tiger","description":"Join the tiger community for 1000 days","bigImgUrl":"https://static.tigerbbs.com/0063fb68ea29c9ae6858c58630e182d5","smallImgUrl":"https://static.tigerbbs.com/96c699a93be4214d4b49aea6a5a5d1a4","grayImgUrl":"https://static.tigerbbs.com/35b0e542a9ff77046ed69ef602bc105d","redirectLinkEnabled":0,"redirectLink":null,"hasAllocated":1,"isWearing":0,"stamp":null,"stampPosition":0,"hasStamp":0,"allocationCount":1,"allocatedDate":"2023.11.04","exceedPercentage":null,"individualDisplayEnabled":0,"backgroundColor":null,"fontColor":null,"individualDisplaySort":0,"categoryType":1001},{"badgeId":"a83d7582f45846ffbccbce770ce65d84-1","templateUuid":"a83d7582f45846ffbccbce770ce65d84","name":"Real Trader","description":"Completed a transaction","bigImgUrl":"https://static.tigerbbs.com/2e08a1cc2087a1de93402c2c290fa65b","smallImgUrl":"https://static.tigerbbs.com/4504a6397ce1137932d56e5f4ce27166","grayImgUrl":"https://static.tigerbbs.com/4b22c79415b4cd6e3d8ebc4a0fa32604","redirectLinkEnabled":0,"redirectLink":null,"hasAllocated":1,"isWearing":0,"stamp":null,"stampPosition":0,"hasStamp":0,"allocationCount":1,"allocatedDate":"2021.12.21","exceedPercentage":null,"individualDisplayEnabled":0,"backgroundColor":null,"fontColor":null,"individualDisplaySort":0,"categoryType":1100}],"userBadgeCount":2,"currentWearingBadge":null,"individualDisplayBadges":null,"crmLevel":2,"crmLevelSwitch":0,"location":null,"starInvestorFollowerNum":0,"starInvestorFlag":false,"starInvestorOrderShareNum":0,"subscribeStarInvestorNum":0,"ror":null,"winRationPercentage":null,"showRor":false,"investmentPhilosophy":null,"starInvestorSubscribeFlag":false},"baikeInfo":{},"tab":"hot","tweets":[{"id":317774127,"gmtCreate":1612489687869,"gmtModify":1704871878699,"author":{"id":"3574907168485306","authorId":"3574907168485306","name":"akr","avatar":"https://static.tigerbbs.com/0be8f2d727ce962e2616ec5896a519a1","crmLevel":2,"crmLevelSwitch":0,"followedFlag":false,"idStr":"3574907168485306","authorIdStr":"3574907168485306"},"themes":[],"htmlText":"Good","listText":"Good","text":"Good","images":[],"top":1,"highlighted":1,"essential":1,"paper":1,"likeSize":0,"commentSize":0,"repostSize":0,"link":"https://ttm.financial/post/317774127","repostId":"1163777643","repostType":4,"repost":{"id":"1163777643","pubTimestamp":1612422826,"share":"https://ttm.financial/m/news/1163777643?lang=&edition=fundamental","pubTime":"2021-02-04 15:13","market":"us","language":"en","title":"Biden administration to restart permitting for major U.S. offshore wind project","url":"https://stock-news.laohu8.com/highlight/detail?id=1163777643","media":"cnbc","summary":"(Reuters) - The Biden administration said on Wednesday it would restart permitting for the first maj","content":"<div>\n<p>(Reuters) - The Biden administration said on Wednesday it would restart permitting for the first major U.S. offshore wind farm, reversing a Trump administration decision that canceled the process late...</p>\n\n<a href=\"https://www.reuters.com/article/us-usa-biden-offshore-wind/biden-administration-to-restart-permitting-for-major-u-s-offshore-wind-project-idUSKBN2A32YG\">Web Link</a>\n\n</div>\n","source":"cnbc_highlight","collect":0,"html":"<!DOCTYPE html>\n<html>\n<head>\n<meta http-equiv=\"Content-Type\" content=\"text/html; charset=utf-8\" />\n<meta name=\"viewport\" content=\"width=device-width,initial-scale=1.0,minimum-scale=1.0,maximum-scale=1.0,user-scalable=no\"/>\n<meta name=\"format-detection\" content=\"telephone=no,email=no,address=no\" />\n<title>Biden administration to restart permitting for major U.S. offshore wind project</title>\n<style type=\"text/css\">\na,abbr,acronym,address,applet,article,aside,audio,b,big,blockquote,body,canvas,caption,center,cite,code,dd,del,details,dfn,div,dl,dt,\nem,embed,fieldset,figcaption,figure,footer,form,h1,h2,h3,h4,h5,h6,header,hgroup,html,i,iframe,img,ins,kbd,label,legend,li,mark,menu,nav,\nobject,ol,output,p,pre,q,ruby,s,samp,section,small,span,strike,strong,sub,summary,sup,table,tbody,td,tfoot,th,thead,time,tr,tt,u,ul,var,video{ font:inherit;margin:0;padding:0;vertical-align:baseline;border:0 }\nbody{ font-size:16px; line-height:1.5; color:#999; background:transparent; }\n.wrapper{ overflow:hidden;word-break:break-all;padding:10px; }\nh1,h2{ font-weight:normal; line-height:1.35; margin-bottom:.6em; }\nh3,h4,h5,h6{ line-height:1.35; margin-bottom:1em; }\nh1{ font-size:24px; }\nh2{ font-size:20px; }\nh3{ font-size:18px; }\nh4{ font-size:16px; }\nh5{ font-size:14px; }\nh6{ font-size:12px; }\np,ul,ol,blockquote,dl,table{ margin:1.2em 0; }\nul,ol{ margin-left:2em; }\nul{ list-style:disc; }\nol{ list-style:decimal; }\nli,li p{ margin:10px 0;}\nimg{ max-width:100%;display:block;margin:0 auto 1em; }\nblockquote{ color:#B5B2B1; border-left:3px solid #aaa; padding:1em; }\nstrong,b{font-weight:bold;}\nem,i{font-style:italic;}\ntable{ width:100%;border-collapse:collapse;border-spacing:1px;margin:1em 0;font-size:.9em; }\nth,td{ padding:5px;text-align:left;border:1px solid #aaa; }\nth{ font-weight:bold;background:#5d5d5d; }\n.symbol-link{font-weight:bold;}\n/* header{ border-bottom:1px solid #494756; } */\n.title{ margin:0 0 8px;line-height:1.3;color:#ddd; }\n.meta {color:#5e5c6d;font-size:13px;margin:0 0 .5em; }\na{text-decoration:none; color:#2a4b87;}\n.meta .head { display: inline-block; overflow: hidden}\n.head .h-thumb { width: 30px; height: 30px; margin: 0; padding: 0; border-radius: 50%; float: left;}\n.head .h-content { margin: 0; padding: 0 0 0 9px; float: left;}\n.head .h-name {font-size: 13px; color: #eee; margin: 0;}\n.head .h-time {font-size: 11px; color: #7E829C; margin: 0;line-height: 11px;}\n.small {font-size: 12.5px; display: inline-block; transform: scale(0.9); -webkit-transform: scale(0.9); transform-origin: left; -webkit-transform-origin: left;}\n.smaller {font-size: 12.5px; display: inline-block; transform: scale(0.8); -webkit-transform: scale(0.8); transform-origin: left; -webkit-transform-origin: left;}\n.bt-text {font-size: 12px;margin: 1.5em 0 0 0}\n.bt-text p {margin: 0}\n</style>\n</head>\n<body>\n<div class=\"wrapper\">\n<header>\n<h2 class=\"title\">\nBiden administration to restart permitting for major U.S. offshore wind project\n</h2>\n\n<h4 class=\"meta\">\n\n\n2021-02-04 15:13 GMT+8 <a href=https://www.reuters.com/article/us-usa-biden-offshore-wind/biden-administration-to-restart-permitting-for-major-u-s-offshore-wind-project-idUSKBN2A32YG><strong>cnbc</strong></a>\n\n\n</h4>\n\n</header>\n<article>\n<div>\n<p>(Reuters) - The Biden administration said on Wednesday it would restart permitting for the first major U.S. offshore wind farm, reversing a Trump administration decision that canceled the process late...</p>\n\n<a href=\"https://www.reuters.com/article/us-usa-biden-offshore-wind/biden-administration-to-restart-permitting-for-major-u-s-offshore-wind-project-idUSKBN2A32YG\">Web Link</a>\n\n</div>\n\n\n</article>\n</div>\n</body>\n</html>\n","type":0,"thumbnail":"","relate_stocks":{".DJI":"道琼斯"},"source_url":"https://www.reuters.com/article/us-usa-biden-offshore-wind/biden-administration-to-restart-permitting-for-major-u-s-offshore-wind-project-idUSKBN2A32YG","is_english":true,"share_image_url":"https://static.laohu8.com/72bb72e1b84c09fca865c6dcb1bbcd16","article_id":"1163777643","content_text":"(Reuters) - The Biden administration said on Wednesday it would restart permitting for the first major U.S. offshore wind farm, reversing a Trump administration decision that canceled the process late last year.\nThe U.S. Bureau of Ocean Energy Management (BOEM) said in a statement it would resume an environmental review of the Vineyard Wind project as part of the administration’s broad plan to speed renewable energy development on federal lands and waters.\n“BOEM is committed to conducting a robust and timely review of the proposed project,” Director Amanda Lefton said in the statement.\nIn December, Vineyard Wind requested a pause in the federal permitting process while it determined whether changes to its design were necessary because of a switch in turbine manufacturers, prompting BOEM to terminate its entire review.\nFormer President Donald Trump had promised to support the nascent U.S. industry as part of his energy dominance agenda, but the permitting of Vineyard Wind was delayed repeatedly in part due to concerns its turbines would interfere with commercial fishing.\nVineyard Wind is a joint venture between Avangrid Inc, a unit of Spain’s Iberdrola, and Denmark’s Copenhagen Infrastructure Partners. The project is 15 miles (24 km) off the coast of Massachusetts. Once constructed, it is expected to provide power to more than 400,000 Massachusetts homes.\n“We’re very pleased,” Vineyard Wind said in a statement. “We look forward to working with the agency as we launch an industry that will create thousands of good paying jobs while also taking meaningful steps to reduce the impact of climate change.”\nThe Responsible Offshore Development Alliance, a fishing industry group, said it hoped the resumption of the permitting process would provide new opportunities for the public to weigh in on the project.","news_type":1},"isVote":1,"tweetType":1,"viewCount":69,"authorTweetTopStatus":1,"verified":2,"comments":[],"imageCount":0,"langContent":"EN","totalScore":0},{"id":317775377,"gmtCreate":1612489633899,"gmtModify":1704871877234,"author":{"id":"3574907168485306","authorId":"3574907168485306","name":"akr","avatar":"https://static.tigerbbs.com/0be8f2d727ce962e2616ec5896a519a1","crmLevel":2,"crmLevelSwitch":0,"followedFlag":false,"idStr":"3574907168485306","authorIdStr":"3574907168485306"},"themes":[],"htmlText":"It is good way to generate electricity. Very much established and in use.. ","listText":"It is good way to generate electricity. Very much established and in use.. ","text":"It is good way to generate electricity. Very much established and in use..","images":[],"top":1,"highlighted":1,"essential":1,"paper":1,"likeSize":0,"commentSize":0,"repostSize":0,"link":"https://ttm.financial/post/317775377","repostId":"1163777643","repostType":4,"repost":{"id":"1163777643","pubTimestamp":1612422826,"share":"https://ttm.financial/m/news/1163777643?lang=&edition=fundamental","pubTime":"2021-02-04 15:13","market":"us","language":"en","title":"Biden administration to restart permitting for major U.S. offshore wind project","url":"https://stock-news.laohu8.com/highlight/detail?id=1163777643","media":"cnbc","summary":"(Reuters) - The Biden administration said on Wednesday it would restart permitting for the first maj","content":"<div>\n<p>(Reuters) - The Biden administration said on Wednesday it would restart permitting for the first major U.S. offshore wind farm, reversing a Trump administration decision that canceled the process late...</p>\n\n<a href=\"https://www.reuters.com/article/us-usa-biden-offshore-wind/biden-administration-to-restart-permitting-for-major-u-s-offshore-wind-project-idUSKBN2A32YG\">Web Link</a>\n\n</div>\n","source":"cnbc_highlight","collect":0,"html":"<!DOCTYPE html>\n<html>\n<head>\n<meta http-equiv=\"Content-Type\" content=\"text/html; charset=utf-8\" />\n<meta name=\"viewport\" content=\"width=device-width,initial-scale=1.0,minimum-scale=1.0,maximum-scale=1.0,user-scalable=no\"/>\n<meta name=\"format-detection\" content=\"telephone=no,email=no,address=no\" />\n<title>Biden administration to restart permitting for major U.S. offshore wind project</title>\n<style type=\"text/css\">\na,abbr,acronym,address,applet,article,aside,audio,b,big,blockquote,body,canvas,caption,center,cite,code,dd,del,details,dfn,div,dl,dt,\nem,embed,fieldset,figcaption,figure,footer,form,h1,h2,h3,h4,h5,h6,header,hgroup,html,i,iframe,img,ins,kbd,label,legend,li,mark,menu,nav,\nobject,ol,output,p,pre,q,ruby,s,samp,section,small,span,strike,strong,sub,summary,sup,table,tbody,td,tfoot,th,thead,time,tr,tt,u,ul,var,video{ font:inherit;margin:0;padding:0;vertical-align:baseline;border:0 }\nbody{ font-size:16px; line-height:1.5; color:#999; background:transparent; }\n.wrapper{ overflow:hidden;word-break:break-all;padding:10px; }\nh1,h2{ font-weight:normal; line-height:1.35; margin-bottom:.6em; }\nh3,h4,h5,h6{ line-height:1.35; margin-bottom:1em; }\nh1{ font-size:24px; }\nh2{ font-size:20px; }\nh3{ font-size:18px; }\nh4{ font-size:16px; }\nh5{ font-size:14px; }\nh6{ font-size:12px; }\np,ul,ol,blockquote,dl,table{ margin:1.2em 0; }\nul,ol{ margin-left:2em; }\nul{ list-style:disc; }\nol{ list-style:decimal; }\nli,li p{ margin:10px 0;}\nimg{ max-width:100%;display:block;margin:0 auto 1em; }\nblockquote{ color:#B5B2B1; border-left:3px solid #aaa; padding:1em; }\nstrong,b{font-weight:bold;}\nem,i{font-style:italic;}\ntable{ width:100%;border-collapse:collapse;border-spacing:1px;margin:1em 0;font-size:.9em; }\nth,td{ padding:5px;text-align:left;border:1px solid #aaa; }\nth{ font-weight:bold;background:#5d5d5d; }\n.symbol-link{font-weight:bold;}\n/* header{ border-bottom:1px solid #494756; } */\n.title{ margin:0 0 8px;line-height:1.3;color:#ddd; }\n.meta {color:#5e5c6d;font-size:13px;margin:0 0 .5em; }\na{text-decoration:none; color:#2a4b87;}\n.meta .head { display: inline-block; overflow: hidden}\n.head .h-thumb { width: 30px; height: 30px; margin: 0; padding: 0; border-radius: 50%; float: left;}\n.head .h-content { margin: 0; padding: 0 0 0 9px; float: left;}\n.head .h-name {font-size: 13px; color: #eee; margin: 0;}\n.head .h-time {font-size: 11px; color: #7E829C; margin: 0;line-height: 11px;}\n.small {font-size: 12.5px; display: inline-block; transform: scale(0.9); -webkit-transform: scale(0.9); transform-origin: left; -webkit-transform-origin: left;}\n.smaller {font-size: 12.5px; display: inline-block; transform: scale(0.8); -webkit-transform: scale(0.8); transform-origin: left; -webkit-transform-origin: left;}\n.bt-text {font-size: 12px;margin: 1.5em 0 0 0}\n.bt-text p {margin: 0}\n</style>\n</head>\n<body>\n<div class=\"wrapper\">\n<header>\n<h2 class=\"title\">\nBiden administration to restart permitting for major U.S. offshore wind project\n</h2>\n\n<h4 class=\"meta\">\n\n\n2021-02-04 15:13 GMT+8 <a href=https://www.reuters.com/article/us-usa-biden-offshore-wind/biden-administration-to-restart-permitting-for-major-u-s-offshore-wind-project-idUSKBN2A32YG><strong>cnbc</strong></a>\n\n\n</h4>\n\n</header>\n<article>\n<div>\n<p>(Reuters) - The Biden administration said on Wednesday it would restart permitting for the first major U.S. offshore wind farm, reversing a Trump administration decision that canceled the process late...</p>\n\n<a href=\"https://www.reuters.com/article/us-usa-biden-offshore-wind/biden-administration-to-restart-permitting-for-major-u-s-offshore-wind-project-idUSKBN2A32YG\">Web Link</a>\n\n</div>\n\n\n</article>\n</div>\n</body>\n</html>\n","type":0,"thumbnail":"","relate_stocks":{".DJI":"道琼斯"},"source_url":"https://www.reuters.com/article/us-usa-biden-offshore-wind/biden-administration-to-restart-permitting-for-major-u-s-offshore-wind-project-idUSKBN2A32YG","is_english":true,"share_image_url":"https://static.laohu8.com/72bb72e1b84c09fca865c6dcb1bbcd16","article_id":"1163777643","content_text":"(Reuters) - The Biden administration said on Wednesday it would restart permitting for the first major U.S. offshore wind farm, reversing a Trump administration decision that canceled the process late last year.\nThe U.S. Bureau of Ocean Energy Management (BOEM) said in a statement it would resume an environmental review of the Vineyard Wind project as part of the administration’s broad plan to speed renewable energy development on federal lands and waters.\n“BOEM is committed to conducting a robust and timely review of the proposed project,” Director Amanda Lefton said in the statement.\nIn December, Vineyard Wind requested a pause in the federal permitting process while it determined whether changes to its design were necessary because of a switch in turbine manufacturers, prompting BOEM to terminate its entire review.\nFormer President Donald Trump had promised to support the nascent U.S. industry as part of his energy dominance agenda, but the permitting of Vineyard Wind was delayed repeatedly in part due to concerns its turbines would interfere with commercial fishing.\nVineyard Wind is a joint venture between Avangrid Inc, a unit of Spain’s Iberdrola, and Denmark’s Copenhagen Infrastructure Partners. The project is 15 miles (24 km) off the coast of Massachusetts. Once constructed, it is expected to provide power to more than 400,000 Massachusetts homes.\n“We’re very pleased,” Vineyard Wind said in a statement. “We look forward to working with the agency as we launch an industry that will create thousands of good paying jobs while also taking meaningful steps to reduce the impact of climate change.”\nThe Responsible Offshore Development Alliance, a fishing industry group, said it hoped the resumption of the permitting process would provide new opportunities for the public to weigh in on the project.","news_type":1},"isVote":1,"tweetType":1,"viewCount":157,"authorTweetTopStatus":1,"verified":2,"comments":[],"imageCount":0,"langContent":"EN","totalScore":0}],"hots":[{"id":317774127,"gmtCreate":1612489687869,"gmtModify":1704871878699,"author":{"id":"3574907168485306","authorId":"3574907168485306","name":"akr","avatar":"https://static.tigerbbs.com/0be8f2d727ce962e2616ec5896a519a1","crmLevel":2,"crmLevelSwitch":0,"followedFlag":false,"idStr":"3574907168485306","authorIdStr":"3574907168485306"},"themes":[],"htmlText":"Good","listText":"Good","text":"Good","images":[],"top":1,"highlighted":1,"essential":1,"paper":1,"likeSize":0,"commentSize":0,"repostSize":0,"link":"https://ttm.financial/post/317774127","repostId":"1163777643","repostType":4,"repost":{"id":"1163777643","pubTimestamp":1612422826,"share":"https://ttm.financial/m/news/1163777643?lang=&edition=fundamental","pubTime":"2021-02-04 15:13","market":"us","language":"en","title":"Biden administration to restart permitting for major U.S. offshore wind project","url":"https://stock-news.laohu8.com/highlight/detail?id=1163777643","media":"cnbc","summary":"(Reuters) - The Biden administration said on Wednesday it would restart permitting for the first maj","content":"<div>\n<p>(Reuters) - The Biden administration said on Wednesday it would restart permitting for the first major U.S. offshore wind farm, reversing a Trump administration decision that canceled the process late...</p>\n\n<a href=\"https://www.reuters.com/article/us-usa-biden-offshore-wind/biden-administration-to-restart-permitting-for-major-u-s-offshore-wind-project-idUSKBN2A32YG\">Web Link</a>\n\n</div>\n","source":"cnbc_highlight","collect":0,"html":"<!DOCTYPE html>\n<html>\n<head>\n<meta http-equiv=\"Content-Type\" content=\"text/html; charset=utf-8\" />\n<meta name=\"viewport\" content=\"width=device-width,initial-scale=1.0,minimum-scale=1.0,maximum-scale=1.0,user-scalable=no\"/>\n<meta name=\"format-detection\" content=\"telephone=no,email=no,address=no\" />\n<title>Biden administration to restart permitting for major U.S. offshore wind project</title>\n<style type=\"text/css\">\na,abbr,acronym,address,applet,article,aside,audio,b,big,blockquote,body,canvas,caption,center,cite,code,dd,del,details,dfn,div,dl,dt,\nem,embed,fieldset,figcaption,figure,footer,form,h1,h2,h3,h4,h5,h6,header,hgroup,html,i,iframe,img,ins,kbd,label,legend,li,mark,menu,nav,\nobject,ol,output,p,pre,q,ruby,s,samp,section,small,span,strike,strong,sub,summary,sup,table,tbody,td,tfoot,th,thead,time,tr,tt,u,ul,var,video{ font:inherit;margin:0;padding:0;vertical-align:baseline;border:0 }\nbody{ font-size:16px; line-height:1.5; color:#999; background:transparent; }\n.wrapper{ overflow:hidden;word-break:break-all;padding:10px; }\nh1,h2{ font-weight:normal; line-height:1.35; margin-bottom:.6em; }\nh3,h4,h5,h6{ line-height:1.35; margin-bottom:1em; }\nh1{ font-size:24px; }\nh2{ font-size:20px; }\nh3{ font-size:18px; }\nh4{ font-size:16px; }\nh5{ font-size:14px; }\nh6{ font-size:12px; }\np,ul,ol,blockquote,dl,table{ margin:1.2em 0; }\nul,ol{ margin-left:2em; }\nul{ list-style:disc; }\nol{ list-style:decimal; }\nli,li p{ margin:10px 0;}\nimg{ max-width:100%;display:block;margin:0 auto 1em; }\nblockquote{ color:#B5B2B1; border-left:3px solid #aaa; padding:1em; }\nstrong,b{font-weight:bold;}\nem,i{font-style:italic;}\ntable{ width:100%;border-collapse:collapse;border-spacing:1px;margin:1em 0;font-size:.9em; }\nth,td{ padding:5px;text-align:left;border:1px solid #aaa; }\nth{ font-weight:bold;background:#5d5d5d; }\n.symbol-link{font-weight:bold;}\n/* header{ border-bottom:1px solid #494756; } */\n.title{ margin:0 0 8px;line-height:1.3;color:#ddd; }\n.meta {color:#5e5c6d;font-size:13px;margin:0 0 .5em; }\na{text-decoration:none; color:#2a4b87;}\n.meta .head { display: inline-block; overflow: hidden}\n.head .h-thumb { width: 30px; height: 30px; margin: 0; padding: 0; border-radius: 50%; float: left;}\n.head .h-content { margin: 0; padding: 0 0 0 9px; float: left;}\n.head .h-name {font-size: 13px; color: #eee; margin: 0;}\n.head .h-time {font-size: 11px; color: #7E829C; margin: 0;line-height: 11px;}\n.small {font-size: 12.5px; display: inline-block; transform: scale(0.9); -webkit-transform: scale(0.9); transform-origin: left; -webkit-transform-origin: left;}\n.smaller {font-size: 12.5px; display: inline-block; transform: scale(0.8); -webkit-transform: scale(0.8); transform-origin: left; -webkit-transform-origin: left;}\n.bt-text {font-size: 12px;margin: 1.5em 0 0 0}\n.bt-text p {margin: 0}\n</style>\n</head>\n<body>\n<div class=\"wrapper\">\n<header>\n<h2 class=\"title\">\nBiden administration to restart permitting for major U.S. offshore wind project\n</h2>\n\n<h4 class=\"meta\">\n\n\n2021-02-04 15:13 GMT+8 <a href=https://www.reuters.com/article/us-usa-biden-offshore-wind/biden-administration-to-restart-permitting-for-major-u-s-offshore-wind-project-idUSKBN2A32YG><strong>cnbc</strong></a>\n\n\n</h4>\n\n</header>\n<article>\n<div>\n<p>(Reuters) - The Biden administration said on Wednesday it would restart permitting for the first major U.S. offshore wind farm, reversing a Trump administration decision that canceled the process late...</p>\n\n<a href=\"https://www.reuters.com/article/us-usa-biden-offshore-wind/biden-administration-to-restart-permitting-for-major-u-s-offshore-wind-project-idUSKBN2A32YG\">Web Link</a>\n\n</div>\n\n\n</article>\n</div>\n</body>\n</html>\n","type":0,"thumbnail":"","relate_stocks":{".DJI":"道琼斯"},"source_url":"https://www.reuters.com/article/us-usa-biden-offshore-wind/biden-administration-to-restart-permitting-for-major-u-s-offshore-wind-project-idUSKBN2A32YG","is_english":true,"share_image_url":"https://static.laohu8.com/72bb72e1b84c09fca865c6dcb1bbcd16","article_id":"1163777643","content_text":"(Reuters) - The Biden administration said on Wednesday it would restart permitting for the first major U.S. offshore wind farm, reversing a Trump administration decision that canceled the process late last year.\nThe U.S. Bureau of Ocean Energy Management (BOEM) said in a statement it would resume an environmental review of the Vineyard Wind project as part of the administration’s broad plan to speed renewable energy development on federal lands and waters.\n“BOEM is committed to conducting a robust and timely review of the proposed project,” Director Amanda Lefton said in the statement.\nIn December, Vineyard Wind requested a pause in the federal permitting process while it determined whether changes to its design were necessary because of a switch in turbine manufacturers, prompting BOEM to terminate its entire review.\nFormer President Donald Trump had promised to support the nascent U.S. industry as part of his energy dominance agenda, but the permitting of Vineyard Wind was delayed repeatedly in part due to concerns its turbines would interfere with commercial fishing.\nVineyard Wind is a joint venture between Avangrid Inc, a unit of Spain’s Iberdrola, and Denmark’s Copenhagen Infrastructure Partners. The project is 15 miles (24 km) off the coast of Massachusetts. Once constructed, it is expected to provide power to more than 400,000 Massachusetts homes.\n“We’re very pleased,” Vineyard Wind said in a statement. “We look forward to working with the agency as we launch an industry that will create thousands of good paying jobs while also taking meaningful steps to reduce the impact of climate change.”\nThe Responsible Offshore Development Alliance, a fishing industry group, said it hoped the resumption of the permitting process would provide new opportunities for the public to weigh in on the project.","news_type":1},"isVote":1,"tweetType":1,"viewCount":69,"authorTweetTopStatus":1,"verified":2,"comments":[],"imageCount":0,"langContent":"EN","totalScore":0},{"id":317775377,"gmtCreate":1612489633899,"gmtModify":1704871877234,"author":{"id":"3574907168485306","authorId":"3574907168485306","name":"akr","avatar":"https://static.tigerbbs.com/0be8f2d727ce962e2616ec5896a519a1","crmLevel":2,"crmLevelSwitch":0,"followedFlag":false,"idStr":"3574907168485306","authorIdStr":"3574907168485306"},"themes":[],"htmlText":"It is good way to generate electricity. Very much established and in use.. ","listText":"It is good way to generate electricity. Very much established and in use.. ","text":"It is good way to generate electricity. Very much established and in use..","images":[],"top":1,"highlighted":1,"essential":1,"paper":1,"likeSize":0,"commentSize":0,"repostSize":0,"link":"https://ttm.financial/post/317775377","repostId":"1163777643","repostType":4,"repost":{"id":"1163777643","pubTimestamp":1612422826,"share":"https://ttm.financial/m/news/1163777643?lang=&edition=fundamental","pubTime":"2021-02-04 15:13","market":"us","language":"en","title":"Biden administration to restart permitting for major U.S. offshore wind project","url":"https://stock-news.laohu8.com/highlight/detail?id=1163777643","media":"cnbc","summary":"(Reuters) - The Biden administration said on Wednesday it would restart permitting for the first maj","content":"<div>\n<p>(Reuters) - The Biden administration said on Wednesday it would restart permitting for the first major U.S. offshore wind farm, reversing a Trump administration decision that canceled the process late...</p>\n\n<a href=\"https://www.reuters.com/article/us-usa-biden-offshore-wind/biden-administration-to-restart-permitting-for-major-u-s-offshore-wind-project-idUSKBN2A32YG\">Web Link</a>\n\n</div>\n","source":"cnbc_highlight","collect":0,"html":"<!DOCTYPE html>\n<html>\n<head>\n<meta http-equiv=\"Content-Type\" content=\"text/html; charset=utf-8\" />\n<meta name=\"viewport\" content=\"width=device-width,initial-scale=1.0,minimum-scale=1.0,maximum-scale=1.0,user-scalable=no\"/>\n<meta name=\"format-detection\" content=\"telephone=no,email=no,address=no\" />\n<title>Biden administration to restart permitting for major U.S. offshore wind project</title>\n<style type=\"text/css\">\na,abbr,acronym,address,applet,article,aside,audio,b,big,blockquote,body,canvas,caption,center,cite,code,dd,del,details,dfn,div,dl,dt,\nem,embed,fieldset,figcaption,figure,footer,form,h1,h2,h3,h4,h5,h6,header,hgroup,html,i,iframe,img,ins,kbd,label,legend,li,mark,menu,nav,\nobject,ol,output,p,pre,q,ruby,s,samp,section,small,span,strike,strong,sub,summary,sup,table,tbody,td,tfoot,th,thead,time,tr,tt,u,ul,var,video{ font:inherit;margin:0;padding:0;vertical-align:baseline;border:0 }\nbody{ font-size:16px; line-height:1.5; color:#999; background:transparent; }\n.wrapper{ overflow:hidden;word-break:break-all;padding:10px; }\nh1,h2{ font-weight:normal; line-height:1.35; margin-bottom:.6em; }\nh3,h4,h5,h6{ line-height:1.35; margin-bottom:1em; }\nh1{ font-size:24px; }\nh2{ font-size:20px; }\nh3{ font-size:18px; }\nh4{ font-size:16px; }\nh5{ font-size:14px; }\nh6{ font-size:12px; }\np,ul,ol,blockquote,dl,table{ margin:1.2em 0; }\nul,ol{ margin-left:2em; }\nul{ list-style:disc; }\nol{ list-style:decimal; }\nli,li p{ margin:10px 0;}\nimg{ max-width:100%;display:block;margin:0 auto 1em; }\nblockquote{ color:#B5B2B1; border-left:3px solid #aaa; padding:1em; }\nstrong,b{font-weight:bold;}\nem,i{font-style:italic;}\ntable{ width:100%;border-collapse:collapse;border-spacing:1px;margin:1em 0;font-size:.9em; }\nth,td{ padding:5px;text-align:left;border:1px solid #aaa; }\nth{ font-weight:bold;background:#5d5d5d; }\n.symbol-link{font-weight:bold;}\n/* header{ border-bottom:1px solid #494756; } */\n.title{ margin:0 0 8px;line-height:1.3;color:#ddd; }\n.meta {color:#5e5c6d;font-size:13px;margin:0 0 .5em; }\na{text-decoration:none; color:#2a4b87;}\n.meta .head { display: inline-block; overflow: hidden}\n.head .h-thumb { width: 30px; height: 30px; margin: 0; padding: 0; border-radius: 50%; float: left;}\n.head .h-content { margin: 0; padding: 0 0 0 9px; float: left;}\n.head .h-name {font-size: 13px; color: #eee; margin: 0;}\n.head .h-time {font-size: 11px; color: #7E829C; margin: 0;line-height: 11px;}\n.small {font-size: 12.5px; display: inline-block; transform: scale(0.9); -webkit-transform: scale(0.9); transform-origin: left; -webkit-transform-origin: left;}\n.smaller {font-size: 12.5px; display: inline-block; transform: scale(0.8); -webkit-transform: scale(0.8); transform-origin: left; -webkit-transform-origin: left;}\n.bt-text {font-size: 12px;margin: 1.5em 0 0 0}\n.bt-text p {margin: 0}\n</style>\n</head>\n<body>\n<div class=\"wrapper\">\n<header>\n<h2 class=\"title\">\nBiden administration to restart permitting for major U.S. offshore wind project\n</h2>\n\n<h4 class=\"meta\">\n\n\n2021-02-04 15:13 GMT+8 <a href=https://www.reuters.com/article/us-usa-biden-offshore-wind/biden-administration-to-restart-permitting-for-major-u-s-offshore-wind-project-idUSKBN2A32YG><strong>cnbc</strong></a>\n\n\n</h4>\n\n</header>\n<article>\n<div>\n<p>(Reuters) - The Biden administration said on Wednesday it would restart permitting for the first major U.S. offshore wind farm, reversing a Trump administration decision that canceled the process late...</p>\n\n<a href=\"https://www.reuters.com/article/us-usa-biden-offshore-wind/biden-administration-to-restart-permitting-for-major-u-s-offshore-wind-project-idUSKBN2A32YG\">Web Link</a>\n\n</div>\n\n\n</article>\n</div>\n</body>\n</html>\n","type":0,"thumbnail":"","relate_stocks":{".DJI":"道琼斯"},"source_url":"https://www.reuters.com/article/us-usa-biden-offshore-wind/biden-administration-to-restart-permitting-for-major-u-s-offshore-wind-project-idUSKBN2A32YG","is_english":true,"share_image_url":"https://static.laohu8.com/72bb72e1b84c09fca865c6dcb1bbcd16","article_id":"1163777643","content_text":"(Reuters) - The Biden administration said on Wednesday it would restart permitting for the first major U.S. offshore wind farm, reversing a Trump administration decision that canceled the process late last year.\nThe U.S. Bureau of Ocean Energy Management (BOEM) said in a statement it would resume an environmental review of the Vineyard Wind project as part of the administration’s broad plan to speed renewable energy development on federal lands and waters.\n“BOEM is committed to conducting a robust and timely review of the proposed project,” Director Amanda Lefton said in the statement.\nIn December, Vineyard Wind requested a pause in the federal permitting process while it determined whether changes to its design were necessary because of a switch in turbine manufacturers, prompting BOEM to terminate its entire review.\nFormer President Donald Trump had promised to support the nascent U.S. industry as part of his energy dominance agenda, but the permitting of Vineyard Wind was delayed repeatedly in part due to concerns its turbines would interfere with commercial fishing.\nVineyard Wind is a joint venture between Avangrid Inc, a unit of Spain’s Iberdrola, and Denmark’s Copenhagen Infrastructure Partners. The project is 15 miles (24 km) off the coast of Massachusetts. Once constructed, it is expected to provide power to more than 400,000 Massachusetts homes.\n“We’re very pleased,” Vineyard Wind said in a statement. “We look forward to working with the agency as we launch an industry that will create thousands of good paying jobs while also taking meaningful steps to reduce the impact of climate change.”\nThe Responsible Offshore Development Alliance, a fishing industry group, said it hoped the resumption of the permitting process would provide new opportunities for the public to weigh in on the project.","news_type":1},"isVote":1,"tweetType":1,"viewCount":157,"authorTweetTopStatus":1,"verified":2,"comments":[],"imageCount":0,"langContent":"EN","totalScore":0}],"lives":[]}